_Joints._--The joints are then to be carefully run with a grouting
composed of one part of best approved Portland cement to two parts of
fine, sharp, clean river sand. (In some cases a hot bituminous mixture
or asphalte is run between the joints as a grouting.)
_Top Dressing._--The whole surface of the pavement is then to be spread
with a coating, at least ¹⁄₂-inch in thickness, of fine sharp gravel or
chippings.
The following heads of general conditions under such a contract may also
be useful.
Alteration of gullies, sewer man-holes etc., will be done at the expense
of the sanitary authority.
Contractor must make good at once any damage caused to gas or water
mains or services--time penalty for delay.
Maintenance of work after completion for a specified time.
Power must be reserved to surveyor to suspend work during bad weather or
from other causes.
Heavy time penalties for non-completion of contract by a certain date.
Payments to be made to contractor on surveyor’s certificate, up to 80
per cent. of whole contract, remaining 20 per cent. to be paid at end of
(say) 2 years after completion.
With the above specimen specification I conclude the chapter on Wood
Paving.
[67] The first wood pavement laid in London was in front of the Old
Bailey, in 1839.
[68] _Vide_ ‘Minutes of Proceedings of the Institution of Civil
Engineers,’ vol. i. p. 131.
[69] This specification is the company’s own, as advertised when they
first began business; for many reasons the boards have since been
discontinued, and other alterations introduced into the system.
[70] I am unable to ascertain if this plan has ever been tried
anywhere.
[71] It is also affirmed by the Borough Surveyor of Sunderland that
this process dispenses with watering. _Vide_ ‘Proceedings of the
Association of Municipal and Sanitary Engineers and Surveyors,’ vol.
iii. p. 72.
[72] _Vide_ ‘A Practical Treatise on Roads, Streets, and Pavements,’
by Q. A. Gillmore, p. 166, which see also for a good account of wood
pavements in the United States.
[73] _Vide_ ‘Wood Pavements,’ by Henry Allnutt, 1880, p. 22.
[74] The power of absorbing water by wood varies from 9·37 to 174·86
per cent. in dry wood. In its ordinary state the power varies from
4·36 to 150·64 per cent. The quantity of water contained in wood in
its natural state varies from 4·61 to 13·56 per cent. _Vide_ ‘Minutes
of Proceedings of the Institution of Civil Engineers,’ vol. lvi. p.
300.
[75] _Vide_ ‘Roads and Roadways,’ by George Waller Wilcocks, 1879, p.
34.
[76] _Vide_ ‘Minutes of Proceedings of the Institution of Civil
Engineers,’ vol. lviii. p. 82.
[77] _Ibid_, vol. lx. p. 293.
[78] _Ibid_, vol. lviii. p. 45.
[79] ‘Report upon Asphalte and Wood Pavements,’ by William Haywood,
(1874) p. 44.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account