In front of the waterproofing, immediately behind the steel columns,
are the systems of terra-cotta ducts in which the electric cables are
placed. The cables can be reached by means of manholes every 200 to
450 feet, which open into the subway and also into the street. The
number of these ducts ranges from 128 down to 32, and they are
connected with the main power station at 58th and 59th Streets and the
Hudson River by a 128-duct subway under the former street.
[Sidenote: _Reinforced
Concrete
Construction_]
The reinforced concrete construction substitutes for the steel roof
beams, steel rods, approximating 1-1/4 inches square, laid in varying
distances according to the different roof loads, from six to ten
inches apart. Rods 1-1/8 inches in diameter tie the side walls,
passing through angle columns in the walls and the bulb-angle columns
in the center. Layers of concrete are laid over the roof rods to a
thickness of from eighteen to thirty inches, and carried two inches
below the rods, imbedding them. For the sides similar square rods and
concrete are used and angle columns five feet apart. The concrete of
the side walls is from fifteen to eighteen inches thick. This type is
shown by photographs on page 41. The rods used are of both square
and twisted form.
[Illustration: LAYING SHEET WATERPROOFING IN BOTTOM]
[Illustration: SPECIAL BRICK AND ASPHALT WATERPROOFING]
[Sidenote: _Methods of
Construction
Typical
Subway_]
The construction of the typical subway has been carried on by a great
variety of methods, partly adopted on account of the conditions under
which the work had to be prosecuted and partly due to the personal
views of the different sub-contractors. The work was all done by open
excavation, the so-called "cut and cover" system, but the conditions
varied widely along different parts of the line, and different means
were adopted to overcome local difficulties. The distance of the rock
surface below the street level had a marked influence on the manner in
which the excavation of the open trenches could be made. In some
places this rock rose nearly to the pavement, as between 14th and 18th
Streets. At other places the subway is located in water-bearing loam
and sand, as in the stretch between Pearl and Grand Streets, where it
was necessary to employ a special design for the bottom, which is
illustrated by drawing on page 42.
This part of the route includes the former site of the ancient Collect
Pond, familiar in the early history of New York, and the excavation
was through made ground, the pond having been filled in for building
purposes after it was abandoned for supplying water to the city. The
excavations through Canal Street, adjacent, were also through made
ground, that street having been at one time, as its name implies, a
canal.
From the City Hall to 9th Street was sand, presenting no particular
difficulties except through the territory just described.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account