The New York Subway, Its Construction and EquipmentInterborough Rapid Transit Company
History
The New York Subway, Its Construction and Equipment
Interborough Rapid Transit Company
Local transit -- New York (State) -- New York; Subways -- New York (State) -- New York
In order to obtain the above desiderata it was decided to install a
complete automatic block signal system for the high-speed routes,
block protection for all obscure points on the low-speed routes, and
to operate all switches both for line movements and in yards by power
from central points. This necessarily involved the interconnection of
the block and switch movements at many locations and made the adoption
of the most flexible and compact appliances essential.
Of the various signal systems in use it was found that the one
promising entirely satisfactory results was the electro-pneumatic
block and interlocking system, by which power in any quantity could be
readily conducted in small pipes any distance and utilized in compact
apparatus in the most restricted spaces. The movements could be made
with the greatest promptness and certainty and interconnected for the
most complicated situations for safety. Moreover, all essential
details of the system had been worked out in years of practical
operation on important trunk lines of railway, so that its reliability
and efficiency were beyond question.
The application of such a system to the New York subway involved an
elaboration of detail not before attempted upon a railway line of
similar length, and the contract for its installation is believed to
be the largest single order ever given to a signal manufacturing
company.
In the application of an automatic block system to an electric railway
where the rails are used for the return circuit of the propulsion
current, it is necessary to modify the system as usually applied to a
steam railway and introduce a track circuit control that will not be
injuriously influenced by the propulsion current. This had been
successfully accomplished for moderately heavy electric railway
traffic in the Boston elevated installation, which was the first
electric railway to adopt a complete automatic block signal system
with track circuit control.
The New York subway operation, however, contemplated traffic of
unprecedented density and consequent magnitude of the electric
currents employed, and experience with existing track circuit control
systems led to the conclusion that some modification in apparatus was
essential to prevent occasional traffic delays.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account