The New York Subway, Its Construction and EquipmentInterborough Rapid Transit Company
History
The New York Subway, Its Construction and Equipment
Interborough Rapid Transit Company
Local transit -- New York (State) -- New York; Subways -- New York (State) -- New York
The proposed operation contemplates a possible maximum of two tracks
loaded with local trains at one minute intervals, and two tracks with
eight car express trains at two minute intervals, the latter class of
trains requiring at times as much as 2,000 horse power for each train
in motion. It is readily seen, then, that combinations of trains in
motion may at certain times occur which will throw enormous demands
for power upon a given section of the road. The electricity conveying
this power flows back through the track rails to the power station and
in so doing is subject to a "drop" or loss in the rails which varies
in amount according to the power demands. This causes disturbances in
the signal-track circuit in proportion to the amount of "drop," and it
was believed that under the extreme condition above mentioned the
ordinary form of track circuit might prove unreliable and cause delay
to traffic. A solution of the difficulty was suggested, consisting in
the employment of a current in the signal track circuit which would
have such characteristic differences from that used to propel the
trains as would operate selectively upon an apparatus which would in
turn control the signal. Alternating current supplied this want on
account of its inductive properties, and was adopted, after a
demonstration of its practicability under similar conditions
elsewhere.
[Illustration: FRONT VIEW OF BLOCK SIGNAL POST, SHOWING LIGHTS,
INDICATORS AND TRACK STOP]
After a decision was reached as to the system to be employed, the
arrangement of the block sections was considered from the standpoint
of maximum safety and maximum traffic capacity, as it was realized
that the rapidly increasing traffic of Greater New York would almost
at once tax the capacity of the line to its utmost.
The usual method of installing automatic block signals in the United
States is to provide home and distant signals with the block sections
extending from home signal to home signal; that is, the block sections
end at the home signals and do not overlap each other. This is also
the arrangement of block sections where the telegraph block or
controlled manual systems are in use. The English block systems,
however, all employ overlaps. Without the overlap, a train in passing
from one block section to the other will clear the home signals for
the section in the rear, as soon as the rear of the train has passed
the home signal of the block in which it is moving. It is thus
possible for a train to stop within the block and within a few feet of
this home signal. If, then, a following train should for any reason
overrun this home signal, a collision would result. With the overlap
system, however, a train may stop at any point in a block section and
still have the home signal at a safe stopping distance in the rear of
the train.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account