The observations necessary to Dr. Wright's calculations were taken along
the line of a railroad, which, very opportunely, had been constructed
along the eastern cliff. Here for a distance of about two miles the
course of the road runs diagonally down the face of the cliff,
descending in that distance about two hundred feet, and in its descent
laying bare the layers of shale upon which the observations must be
made. Along the course of the road at this point, watchmen are
continually employed to remove obstructions falling down or to give
warning of danger when any large masses fall. The disintegration goes on
much more rapidly in wet thawing weather than at other times of the
year. Often in the spring the whole force of section hands is required
for several days to dispose of the material of one single fall. At the
rate of one-fourth of an inch a year of waste along this cliff there
ought to fall slightly over six hundred cubic yards annually for each
mile where the wall is 150 feet high. At this rate the enlargement at
the terminal of the Gorge would take place, Dr. Wright estimates, in
somewhat less than ten thousand years. No accounts have been kept by the
railroad of the amount of fallen material, but some estimate can be made
from the cost of removal of the falling stone, together with the
observations of the watchmen, one of whom has been in the employ of the
railroad in this capacity for twelve years, and also by noticing the
distance to which the cliff has receded since the construction of the
road.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account