The Old Pike: A History of the National Road, with Incidents, Accidents, and Anecdotes ThereonSearight, Thomas B. (Thomas Brownfield)
History
The Old Pike: A History of the National Road, with Incidents, Accidents, and Anecdotes Thereon
Searight, Thomas B. (Thomas Brownfield)
Cumberland Road; Pennsylvania -- Biography
To make this a permanent and substantial road, such that the heavy
transportation wagons shall not force their wheels through the metal
into the bed, not less than the original contemplated thickness of three
strata of three inches each, or the same number of strata of three
perches and a half of stone each, appears sufficient. That three inches
of metal will not suffice to bear up the travel passing over this road,
is proved by the experience of the last two years. Nor will six inches
answer the purpose on all parts of the road, during a long or continued
wet spell of weather, when, from absorption alone, the solidity and
contiguity of the metal has become weakened and lessened. On the crests
of the hills it will be solid, with a thickness of six inches, when, in
the valley and grades under one degree, the evidence of its
insufficiency are apparent. Nothing less than the three strata of three
inches each has been found sufficient; the last stratum being unequally
applied according to the firmness and dryness, and the slope or grade of
the bed. Such was judged necessary for a Macadam road from Cumberland to
Wheeling, and the results tend to confirm the necessity of a thickness
of nine inches on an average, to secure the object contemplated by the
instructions of the Chief Engineer.
The condition of the masonry on the whole line of the road is in an
unfinished state, so far as regards many of the parts upon which repairs
have been commenced; and where nothing had been done toward repairing
the bridges, many of their side-walls or parapets are in a dilapidated
state, or torn down to the level of the roadway. In repairing the road
under the last act of Congress, no more masonry was undertaken than the
construction of culverts to drain the road, and repairing such parts as
were necessary to perfect the roadway twenty feet in width; all other
parts were left in the unfinished and decayed state in which they were
when the appropriation of the year caused an abandonment of further
repairs to this part of the work.
To carry into effect the repairs originally contemplated, and to secure
the uniform strength throughout the whole line of the road equivalent to
nine inches of metal, the following sums will be necessary, after
applying the means now on hand, and which are pledged for the work
commenced and contracted for in July last.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account