In controlling the Chagres, the engineers again took what on any
private work would have been regarded as absurd precaution. In the
first place, Gatun Lake will be so big that the Chagres can break
every record it heretofore has set, both for momentary high water and
for sustained high water, and still, with no water being let out of
the lake, it can continue to flow that way for a day and a half
without disturbing things at all. It could flow for two days before
any serious damage could be done. Thus the canal force might be off
duty for some 45 hours, with the outlet closed, before any really
serious damage could be done by the rampage of the river.
But of course no one supposes that it would be humanly possible that
two such contingencies as the highest water ever known, and everybody
asleep at their posts for two days, could happen together. When the
water in the lake reached its normal level of 87 feet the spillway
gates would be opened, and, if necessary, it would begin to discharge
145,000 feet of water a second. This is 17,000 feet more than the
record for sustained flow heretofore set by the Chagres. But if it
were found that even this was inadequate the culverts in the locks
could be brought into play, and with them the full discharge would be
brought up to 194,000 feet a second, or 57,000 more than the Chagres
has ever brought down. But suppose even this would not suffice to take
care of the floods of the Chagres? The spillway is so arranged that as
the level of the water in the lake rises the discharging capacity
increases. With the spillway open, even if the Chagres were to double
its record for continued high water, it would take many days to bring
the lake level up to the danger point--92 feet. When it reached that
height the spillway would have a capacity of 222,000 feet, which, with
the aid of the big lock culverts, would bring the total discharge up
to 262,000 feet a second--only 12,000 cubic feet less than double the
highest known flow of the Chagres.
But this is only characteristic of what one sees everywhere. Whether
it be in making a spillway that would accommodate two rivers like the
Chagres instead of one, or in building dams with 63 pounds of weight
for every pound of pressure against it, or yet in building lock gates
which will bear several times the maximum weight that can ever be
brought against them, the work at Panama was done with the intent to
provide against every possible contingency.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account