The Panama CanalHaskin, Frederic J. (Frederic Jennings)
History
The Panama Canal
Haskin, Frederic J. (Frederic Jennings)
Panama Canal (Panama)
The Chagres River approaches the canal at approximately right angles
at Gamboa, some 21 miles above Gatun. The lake will be so large that
the river currents will all be absorbed, the water backing far up into
the Chagres, the river depositing its silt before it reaches the canal
proper.
With the currents thus checked, the Chagres will lose all power to
interfere with the navigation of the canal, although upon the bosom of
its water will travel for a distance of 35 miles all the ships that
pass through the big waterway from Gatun to Miraflores. This fresh
water will serve a useful purpose besides carrying ships over the
backbone of the continent. Barnacles lose their clinging power in
fresh water, and when a ship passes up through the locks from sea
level to lake level and from salt water to fresh, the barnacles that
have clung to the sides and bottom of the vessel through many a
thousand mile of "sky-hooting through the brine" will have their grip
broken and they will drop off helplessly and fall to the bed of the
lake, which, in the course of years, will become barnacle-paved. How
many times in dry-dock this will save can only be surmised, but the
ship that goes through the canal regularly will not have much bother
with barnacles.
The engineer who worked out the details of the engineering examination
of the dam in 1908 was Caleb M. Saville, who had had experience on
some of the greatest dams in the world. In the first place, the whole
foundation was honeycombed with test borings, and several shafts were
sunk so that the engineers could go down and see for themselves
exactly what was the nature of the material below. There are some
problems in engineering where a decision is so close between safety
and danger that none but an engineer can decide them. But Gatun Dam
could speak for itself and in the layman's tongue.
After investigating the site and getting such conclusive evidence that
the proverbial wayfaring man might understand it the engineers next
conducted a series of experiments to determine whether or not the
material of which they proposed to build the dam would be watertight.
They wanted to make sure whether enough water would seep through to
carry any of the dam material along with it. The maximum normal depth
of the water is 85 feet. The material it would have to seep through is
nearly a half mile thick. In order to determine how the water would
behave they took some 3 feet of the material and put it in a strong
iron cylinder with water above it and subjected it to a pressure
equivalent to a head of 185 feet of water. Only an occasional drop
came through. If only an occasional drop of clear water gets through 3
feet of material under a pressure of 185 feet of water, it does not
require a great engineer to determine that there will not be any
seepage through more than a thousand feet of the same material under a
head of only 85 feet.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account