The Panama CanalHaskin, Frederic J. (Frederic Jennings)
History
The Panama Canal
Haskin, Frederic J. (Frederic Jennings)
Panama Canal (Panama)
Remembering that these gates are nothing more than Brobdingnagian
double doors which close in the shape of a flattened V, it follows
that they must have hinges. And these hinges are worth going miles to
see. That part which fastens to the wall of the lock weighs 36,752
pounds in the case of the operating gates, and 38,476 pounds in the
protection gates. These latter are placed in pairs with the operating
gates at all danger points--so that if one set of gates are rammed
down, another pair will still be in position. The part of the hinge
attached to the gate was made according to specifications which
required that it should stand a strain of 40,000 pounds before
stretching at all, and 70,000 pounds before breaking. Put into a huge
testing machine, it actually stood a strain of 3,300,000 pounds before
breaking--seven times as great as any stress it will ever be called
upon to bear. The gates are all painted a lead gray, to match the
ships of the American Navy. Those which come into contact with sea
water will be treated with a barnacle-proof preparation.
Now that we have described the locks, we may go back and see them in
course of construction. The first task was getting the lock building
plant designed and built. At Gatun the plant consisted of a series of
immense cableways, an electric railroad, and enormous concrete mixers.
Great towers were erected on either side of the area excavated for the
locks, with giant cables connecting them. These towers were 85 feet
high, and were mounted on tracks like steam shovels, so that they
could be moved forward as the work progressed. The cables connecting
them were of 2-1/2-inch lock steel wire covered with interlocking
strands. They were guaranteed to carry 6 tons at a trip, 20 trips an
hour, and to carry 60,000 loads before giving way. They actually did
better than the specifications called for as far as endurance was
concerned.
The sand for making the concrete for Gatun came from Nombre de Dios
(Spanish for Name of God), and the gravel from Porto Bello. The sand
and gravel were towed in great barges, first through the old French
Canal, and later through the Atlantic entrance of the present canal.
Great clamshell buckets on the Lidgerwood cableways would swoop down
upon the barges, get 2 cubic yards of material at a mouthful, lift it
up to the cable, carry it across to the storage piles and there dump
it. In this way more than 2,000,000 wagon loads of sand and gravel
were handled.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account