On the Pacific side the concrete handling plant was somewhat
different. Instead of cableways there were great cantilever cranes
built of structural steel. Some of these were in the shape of a giant
T, while others looked like two T's fastened together. Here the
clamshell dippers were run out on the arms of the cranes to the
storage piles, where they picked up their loads of material. This was
put in hoppers large enough to store material for 10 cubic yards. The
sand and stone then passed through measuring hoppers and to the mixers
with cement and water added. After it was mixed it was dumped into big
buckets on little cars drawn by baby steam locomotives, which looked
like overgrown toy engines. These little fellows reminded one of a lot
of busy bees as they dashed about here and there with their loads of
concrete, choo-chooing as majestically as the great dirt train engines
which passed back and forth hard by. The cranes would take their
filled buckets and leave empty ones in exchange, and this was kept up
day in and day out until the locks were completed. When the plant was
removed from Pedro Miguel to Miraflores, a large part of the concrete
was handled directly from the mixers to the walls by the cranes
without the intermediary locomotive service.
The cost of the construction of the locks was estimated in 1908 at
upward of $57,000,000. But economy in the handling of the material and
efficiency on the part of the lock builders cut the actual cost far
below that figure. On the Atlantic side about a dollar was saved on
every yard of concrete laid--about $2,000,000. On the Pacific side
more than twice as much was saved.
Before the locks could be built it became necessary to excavate down
to bed rock. This required the removal of nearly 5,000,000 cubic yards
of material at Gatun. Then extensive tests were made to make certain
that the floor of the locks could be anchored safely to the rock.
These tests demonstrated that by using the old steel rails that were
left on the Isthmus by the French, the concrete and rock could be tied
together so firmly as to defy the ravages of water and time. A huge
apron of concrete was built out into Gatun Lake from the upper locks
at that place, effectively preventing any water from getting between
the rocks and the concrete lying upon them.
CHAPTER V
THE LOCK MACHINERY
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account