The Panama CanalHaskin, Frederic J. (Frederic Jennings)
History
The Panama Canal
Haskin, Frederic J. (Frederic Jennings)
Panama Canal (Panama)
Here again one meets the familiar safeguard against accident. Some
engineer of one of these towing locomotives might sometime overload
it, so the power of doing so has been taken out of his hands. On the
windlass or drum that holds the towing hawser there is a friction
coupling. If the engineer should attempt to overload his engine, or if
for any other reason there should suddenly come upon the locomotive a
greater strain than it could bear, or upon the track, or upon the
hawser, the friction clutch would let loose at its appointed tension
of 25,000 pounds, and all danger would be averted.
When the locomotives are towing a ship from the walls it is natural
that there should be a side pull on the hawser. This is overcome by
wheels that run against the side of the track and are mounted
horizontally. All of the towing tracks extend out on the approach
walls of the locks so that the locomotives can get out far enough to
take charge of a ship before it gets close enough to do the locks any
damage.
[Illustration: A _Mauretania_ IN THE LOCKS]
From the foregoing it will be seen that a great deal of electric
current will be required in the operation of the locks. This will be
generated at a big station at Gatun, with a smaller one at Miraflores,
and they will be connected. The overflow water will be used for
generating the required current, and in addition to the operation of
the lock machinery it will operate the spillway gates, furnish the
necessary lighting current, and eventually it may furnish the power
for an electrified Panama Railroad.
In passing a ship through the canal it will be necessary to open and
close 23 lock gates, of an aggregate weight of more than 25,000 tons,
to lower and raise 12 fender chains, each weighing 24,000 pounds, and
to shut and open dozens of great valves, each of which weighs tons.
All these operations at each set of locks will be controlled by one
man, at a central switchboard. In addition to these operations there
is the towing apparatus. The arrangement at Gatun is typical; there 4
fender chains must be operated, 6 pairs of miter gates, and 46 valves.
In all not less than 98 motors will be set in motion twice, and
sometimes this number may be increased to 143. Some of them are more
than half a mile away from the operator, and half of them are nearly a
quarter of a mile away.
The operator in his control house will be high enough to have an
uninterrupted view of the whole flight of locks over which he has
command. His control board will consist of a representation of the
locks his switches control. On his model he will see the rise and fall
of the fender chains as he operates them, the movement of the big lock
gates as they swing open or shut, the opening and closing of the
valves which regulate the water in the culverts, and the rise and fall
of the water in the locks.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account