When estimates for digging the canal were made, it was calculated that
53,000,000 cubic yards of material would have to be removed from the
cut, and that under the most favorable conditions it would require
eight and a half years to complete the work. But at that time no one
had the remotest idea of the actual difficulties that would beset the
canal builders; no one dreamed of the avalanches of material that
would slide into the cut.
One can in no way get a better idea of the meaning of the slides and
breaks in Culebra Cut than to refer to the accompanying figure. There
it will be seen that whereas it was originally planned that the top
width of the cut at one point should be 670 feet, it has grown wider,
because of slides and breaks, to as much as 1,800 feet at one place.
In all, some 25,000,000 cubic yards of material which should have
remained outside the canal prism slipped into it and had to be
removed by the steam shovels.
[Illustration: THE EFFECT OF SLIDES]
No less than 26 slides and breaks were encountered in the construction
of Culebra Cut, their total area being 225 acres. The largest covered
75, and another 47 acres. When the slides, which were more like
earthen glaciers than avalanches, began to flow into the big ditch,
sometimes steam shovels were buried, sometimes railroad tracks were
caught beneath the débris, and sometimes even the bottom of the cut
itself began to bulge and disarrange the entire transportation system,
at the same time interfering with the compressed air and water
supplies. But with all these trials and tribulations, the army that
was trying to conquer the eternal hills that had refused passage to
the ships of the world for so many centuries, kept up its courage and
renewed its attack. The result is that ships sail through Culebra and
that engineers everywhere have new records of efficiency to inspire
them.
These efficiency records are told in the cost-keeping reports based
upon one of the most careful and thorough cost-accounting systems ever
devised. This system was instituted for the purpose of keeping a check
upon all expenditures by reducing everything to a unit basis and then
comparing the cost of doing the same thing at different places. For
instance, if it were found that it cost more to excavate a cubic yard
of material at one place than at another, under identical conditions,
this fact was brought to the attention of the men responsible and an
intimation given that there seemed to be room for taking up a little
lost motion. The lost motion usually was recovered or else someone had
to be satisfied that conditions were not identical after all.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account