As has been said, the problem of digging the big ditch has been one of
the transportation of the spoil, and this has involved numerous
difficulties. In Culebra Cut no little difficulty was experienced in
keeping open enough tracks to afford the necessary room for dirt
trains. Slides came down and forced track after track out of
alignment, burying some of them beyond the hope of usable recovery;
often the very bottom of the cut itself heaved up under the stress of
the heavy weight of faulty strata on the sides of the mountain; and
sometimes the slides and breaks threatened entirely to shut up one end
of the cut.
In hauling away the spoil one improvement after another was made in
the interest of efficiency. It was found at first that the capacity of
a big Lidgerwood flat car was only about 16 cubic yards, and that with
a sideboard on only one side of the car, the load did not center well
on the car, thus placing an undue strain on the wheels on one side.
The transportation department, therefore, extended the bed of the car
further out over the wheels on the open side, and this served a triple
purpose--it permitted the steam shovels to load the cars so that the
load rested in the center, increased the capacity of each car by about
3 yards, and permitted the unloader plow to throw the spoil further
from the track, thus adding to the efficiency of the dumping
apparatus.
Frequent breaks in the trains were caused by worn couplers. These
accidents were almost entirely overcome by equipping each train with a
sort of "bridle" which prevented the separation of the cars in the
event of the parting of a defective coupler. In the operation of the
unloader plows it was found that the big cables frequently broke when
a plow would strike an obstruction on the car, and this caused no end
of annoyance and frequent delays. Then someone thought of putting
between the cable and the plow a link whose breaking point was lower
than that of the cable. After that when a plow struck an obstruction
the cable did not part--the link simply gave way, and another was
always at hand. On the big spreaders no less than 51 improvements were
made, each the answer of the engineers to some challenge from the
stubborn material with which they had to contend.
The major portion of the material excavated from the canal had to be
hauled out and dumped where it was of no further use. From the Central
Division alone, which includes Culebra Cut, upward of a hundred
million cubic yards of material was hauled away and dumped as useless.
At Tabernilla one dump contained nearly 17,000,000 cubic yards. A
great deal of spoil, however, was used to excellent advantage.
Wherever there was swampy ground contiguous to the permanent
settlements it was covered over with material from the cut and brought
up above the water level. Many hundreds of acres were thus converted
from malaria-breeding grounds into high and dry lands.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account