The development of labor-saving machinery has been so marked since the
construction of the canal was actually commenced that each month’s
work has marked an increase in the amount of debris excavated from
the canal prism. When the Government began operations in 1906, the
engineers had before them the task of excavating 110,000,000 cubic
yards. Their first month’s operations were very successful, and they
reported at the end of the month an excavation of about 250,000 cubic
yards. They estimated that if they could keep up this amount of work
through each month they could finish the canal at a certain time; but
the carping yellow newspapers and magazines of the United States and
Europe were extremely skeptical of the ability of the Canal Commission
to continue to turn out 250,000 cubic yards per month. The critics
foretold that when the rainy season came more debris would be carried
into the canal prism by floods than could be taken out by machinery
in the dry season. At times this criticism grew very irksome and
disagreeable to the commissioners. However, they kept their temper, and
continued improving their machinery, and month by month the output grew
greatly. It grew to such an enormous extent that the estimated time has
been shortened to the extent that I have formerly indicated.
[Illustration: CANAL ADMINISTRATION BUILDING, PANAMA.]
The Work of Excavation
To give a comparison by the use of figures of the remarkable progress
made, I will say that about six months ago I took up the report of the
Canal Commission and I found that in the previous month the amount of
debris excavated for that one month exceeded 4,000,000 of cubic yards,
this tremendous output being a complete answer to the criticisms of the
opponents of canal construction.
In order to give a mental picture of the type of canal, let us take an
imaginary trip through the canal proper. It will be forty-two miles
from shore to shore. In addition to this there will be an excavation
out in Limon bay on the eastern side, and in Panama bay on the western
side, of about four miles on either side, in order to reach deep water.
Supposing that we are sailing down through Limon bay, which is a
small bay at the bottom of the Caribbean sea, on one of our American
battleships. We first enter the canal which leads from the bay up into
the shore toward Gatun dam, and this section of the canal will be 500
feet wide and 40 feet deep at low water level. This channel penetrates
through the mud banks and land about four miles, when it encounters
Gatun dam. Gatun dam must be surmounted through the agency of locks,
which have been previously described.
Operation of the Locks
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account