In order therefore to make a tide-level canal, some means must be found
for disposing of the waters of the Chagres and other rivers. De
Lesseps's tide-level project was rather an aspiration than a plan. He
proposed to conduct the waters of the Chagres to the sea by other
channels. The magnitude of this task would be scarcely less than that of
cutting the Canal itself. The other rivers on both sides of the Canal
would likewise require diversion channels, so that the final result
would be roughly the formation of three channels, of which the centre
one would be for navigation. The Board of Consulting Engineers summoned
by President Roosevelt in 1905 to advise the Isthmian Canal Commission
recommended, in a majority report, a tide-level canal as practicable and
best fulfilling the national requirements, defined by the Spooner Act of
1902. But whereas they had detailed schemes for high-level canals before
them, they were in the matter of the sea-level project at the
disadvantage of having to act in a constructive capacity and elaborate
the details of a scheme before they could criticise it. Moreover, five
of the eight who constituted the majority were European engineers, who
returned to their duties as soon as the report was drafted. The report
of the minority in favour of the 85-foot-level scheme having been
adopted by Congress in 1906, all available engineering talent has for
the last two years been devoted to improving the details of this scheme.
The tide-level project of the majority of the Board has had no such
advantage, and the difficulty of estimating the relative advantages of
the two schemes is therefore all the greater.
Both schemes depend for their success upon the security of dams.
The tide-level scheme has a dam at Gamboa, near Obispo, thus making a
lake of the upper waters of the Chagres, whose surface would be 200 feet
above sea-level.[8] The floodwater would partly be accommodated in the
lake by reason of the great height of the dam above low-water stage, and
partly by running the excess into the Canal, by which it would escape to
the sea, generating currents which the Board calculated would not attain
an injurious velocity.
[8] Report, Board of Consulting Engineers, p. 205.
Streams entering the Chagres in its lower reaches would be dammed back
or diverted--a considerable, but not momentous, undertaking. The three
great objections to the scheme appeared to be:--
1. The extra cost, and above all the extra time, required to complete
the immensely greater quantity of excavation required for the last 85
feet;
2. The fact that the artificial lake was to be above the Canal, so that,
if the dam burst, the Canal might be ruined; and,
3. That the velocity of currents in the Canal due to discharge of the
surplus waters might perhaps be a serious drawback to navigation in a
narrow channel.
It will be seen presently that the second disadvantage is offset by
corresponding disadvantages in the dam required for the high-level
canal.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account