The Canal, as already stated, is to be fortified; but I made no
inquiries as to the location or character of the proposed
fortifications, a matter which I regarded as outside my province. The
cost of fortifications is included in the provision made by Congress for
the Canal.
CHAPTER III
ON THE PRESENT CONDITION OF THE CULEBRA CUT, AND ON THE METHODS EMPLOYED
FOR EXCAVATION AND DISPOSAL OF THE SPOIL
REFERENCE once more to the plan and profile on the map will show at a
glance the length and position of the rocky divide, the whole of which
is termed the Culebra Cut, from the name of the town near the highest
point. The proposed form and dimensions of this cut, throughout the 5
miles of the greatest height, is also shown (the section adopted at the
commencement of 1906), and the stage reached in April, 1908, is shown by
the photographs. The line drawn across the above section at a level of
120 feet above bottom (160 feet above sea), shows the general level of
the bottom of the workings at Culebra itself at the time the photographs
were taken. A narrow pilot cut, only, was then 20 feet lower.
[Illustration: ROCK DRILL.]
[Illustration: ROCK DRILLS AT WORK IN THE CUT.]
All that part of the section below this line (+160) remained to be
excavated.
Most of the rock above this line has been removed, but not all, for the
final width is not, of course, reached at any level until the central
portion has been excavated below that level.
The level of the original rock line shown in this section was +275,
_i.e._, 235 above canal bottom, so that the photographs show excavation
of 115 feet of rock. There was, however, soil above the hard basaltic
rock, of varying thickness--removed to the slope 1:2 as shown on the
section. The highest original surface of the soil on the centre line of
the Canal (between Golden Hill and Silver Hill at Culebra) was +312
feet,[17] so that the photographs in which Golden Hill appears show a
total excavation of 152 feet along the centre line. As this line passed
along a saddle between the two hills, the original surface at the sides
was considerably higher, so that the total height shown in the
photographs from the bottom of the cut to the highest berm, or ledge, on
Golden Hill is considerably more than 152 feet.
[17] The profile at end of volume shows the stage of excavation
when the height here had been reduced to +210.
The bottom of the Canal will be 272 feet below the original saddle, and
its depth below this berm, which is seen on the photograph, is
considerably more. Thus will the gorge appear when the excavation is
finished and before the water is allowed to flow in. When full, the
surface of the water will be 227 feet below the original saddle, and the
passenger on a vessel will gaze upon the scarped banks of a somewhat
greater height than this.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account