At Panama the mosquito is almost an extinct
animal, and though the heat there is sometimes trying, a run up to
Culebra brings one to a dry and bracing atmosphere where a fresh breeze
is almost always blowing.
[18] During 1908 no less than one million dynamite charges were
exploded.
The steam shovel is the principal agent of excavation. It scoops out
loose soil directly, but the basaltic rock has to be broken up first by
blasting. One shovel will load 1,200 cubic yards of such materials upon
the cars within the working day of 8 hours, an amount equal to 600
two-horse loads.
For accelerating transportation railway trucks provided with flaps are
used, which make of the whole train a single platform. At the rear of
the train is a plough which can be drawn by a wire rope attached to a
drum carried on a special car in the fore part of the train. When the
train arrives at the dump the drum is started, and the plough,
advancing, clears the 320 cubic yards of earth and rock from the 16 cars
in 7 minutes. This is the Lidgerwood Unloader.
Another important piece of machinery is the track-shifter, which picks
up and relays the railway lines of the ever-shifting spoil-tracks. This
remarkably successful contrivance was invented by an employee on the
Isthmus, and is moreover manufactured there in the great workshops at
Gorgona.
[Illustration: FROM CULEBRA, LOOKING EAST TO DISTANT HILLS.]
[Illustration: FROM CULEBRA, LOOKING EAST ACROSS THE CUT.]
From Bas Obispo to Pedro Miguel, which constitutes the Cut, is a
distance of about 9 miles, and excavation is so planned that a summit is
maintained at Lirio, near Culebra, about half-way between these two
points. On the north slope are[19] 21 steam shovels, loading cars on 14
tracks. These, when loaded, are hauled down-grade to the northern dumps
at Tavernilla and elsewhere, or to the site of the Gatun dam, which is
also a dump. Nearly 4,000 cubic yards of rock are carried to the dam
daily, a distance of about 24 miles. The return up-grade is made with
empty cars. On the southern slope about the same number of steam shovels
are at work, the spoil being taken to the southern dumping grounds on
the Pacific side, including the trestle dump for the breakwater to Naos
Island. The spoil-trains follow one another at intervals of about three
minutes, and if, from any cause, delay occur, the steam shovels, and
indeed the whole process of excavation, is brought to a standstill. Any
cause of delay is therefore reported at once by telephone to the
Superintendent of Transportation at Empire, and all energies are at once
directed to clearing the way. On the Isthmus everything gives way to the
spoil-train, as in a city to the fire-engine. An excellent lesson both
in the complexity and urgency of the transportation is afforded by a run
through the Cut on a motor trolley in company with the Superintendent of
the Department of Excavation. Constantly shunted from one track to
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account