The drainage basin of Passaic River is admirably adapted to the
development of the conservation system. At its headwaters in the
mountains of northern New Jersey are numerous sites for reservoirs. The
comparatively limited area draining into Passaic River makes such a
scheme relatively inexpensive. On the other hand there is abundant
opportunity for effective work in removing obstructions and
straightening and deepening the channel of the lower river. So that, all
things considered, the prevention of flood damages in the Passaic Basin
can be best accomplished by a combination of the two general methods
above outlined.
LOWER VALLEY IMPROVEMENTS.
The channel of Passaic River below Great Falls, at Paterson, is of
limited capacity. To anyone making an inspection, especially within the
city of Paterson, it is readily apparent that the river bed has for
years been considered a legitimate field for encroachment. Owners of
lands fronting on the river have increased their holdings by filling in
beyond the channel line. Buildings have been erected upon these tracts
and the builders have not hesitated to extend retaining walls still
farther into the river bed. Refuse from the city's streets, light and
unstable in character, has been freely deposited upon the bank to be
carried out into the river. Thus the channel has been constricted
laterally, the bottom raised, and there is left for the flood waters no
alternative than that of extending themselves in the upward direction.
It would seem that this, at least, should have been unobstructed. Such,
however, is not the case.
The bridges across the Passaic have apparently been erected without
reference to channel capacity. The authorities have evidently considered
it more important to retain established approach levels than to provide
proper capacity for river water. As an example the following instance
may be cited: During the flood of 1902 a steel truss bridge across the
river in Paterson was carried away. The point of crossing was one of
the narrowest places in the stream and it should have been clear to
everyone that the space beneath the bridge was not large enough to carry
flood waters. It should have been apparent that a new bridge, if erected
at that point, must be higher than the old one, to be thoroughly safe.
Notwithstanding, the new bridge was erected at the level of the old one,
and in addition to this, it was a concrete arch structure, and the great
piers and low arch springs reduced the former channel capacity about 15
per cent. This new bridge, as might be expected, collapsed during the
October flood.
Along the entire course of the stream in the lower valley we find a
continuation of instances of unreasonable encroachment and
ill-considered bridge engineering, and there is opportunity for
relieving a large part of the purely local obstructions by straightening
the channel at chosen points.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account