At Iloílo the dredging of a fifteen-foot channel up to the custom-house
was completed in March, 1907. Seven hundred and eighty-three feet
of river wall and twelve hundred ninety feet of reënforced concrete
wharf, both to accommodate vessels of eighteen feet draft at low
water, have been built along the south bank of the middle reach of
the river. The lower reach has been dredged to twenty-four feet at
low water, the middle reach to eighteen feet and the upper reach to
fifteen feet, while two hundred ten thousand square metres of land
have been reclaimed and two hundred six thousand improved with the
dredged material. Wharves for ocean-going steamers should ultimately
be constructed at this important port.
At Paracale, in Ambos Camarines, a reënforced concrete pier four
hundred ninety feet in length has been built. It extends out to a
depth of fifteen feet at low water.
At Bais, Negros, a timber pier for vessels of sixteen feet draft,
with a stone causeway approach a mile and a half in length, and a
warehouse for the temporary storage of sugar, have been constructed.
Channels have been blasted through the coral reefs surrounding the
islands Batan, Sabtang and Itbayat in the Batanes group, where the
annual loss of life had previously been great, owing to the occurrence
of sudden storms which often made it impossible for people to return
to their towns through the surf. The port of Pandan, in Ilocos Sur,
has been improved by means of a stone revetment twenty-nine hundred
seventy-five feet in length along the north bank of the Abra River,
thus maintaining the channel in one position and affording vastly
better means of loading and discharging cargo for the important town
of Vigan. A self-propelling combination snag boat, pile driver and
dredge for the improvement of the great Cagayan River has been built,
and is now in operation on that stream.
Very numerous other works of repair and construction have been carried
out. Some 80 surveys have been made in minor ports to determine
the feasibility of improvements, and in many cases plans have been
prepared for proposed work.
The Spaniards had devoted much time and study to a project for
coast illumination. At the outbreak of the insurrection in 1896
they had twenty-eight lights, fourteen of which were flashing and
fourteen fixed minor lights, while four additional stations were
under construction. Then all work was stopped, and when systematic
inspection was made by American lighthouse engineers five years later,
extensive repairs were found to be necessary. The repairs were made as
promptly as possible, and new construction then began. To-day there
are a hundred forty-five lights in operation, and the waters of the
Philippines are among the best lighted in the world. One hundred and
eleven buoys of various classes are being maintained.
The following table shows the progress made in the construction of
lighthouses:--
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account