GENERAL CONSTRUCTION.--On the question of general construction there is
little to be said, except that buildings are now being properly designed in
more permanent form than were some of the earlier buildings. On the whole
there is little fault to be found with factories in general, except in so
far as the output has outgrown the accommodation.
Most factories are now erected in iron, but there are a few which are built
of bricks. It should be premised that a factory in which rubber is to be
prepared should be as light and airy as possible. In this respect quite a
number of the older factories are lacking, and they seem to have been
designed to exclude as much air and light as possible. Under these
circumstances, the building is always dark, there is always an air of
dampness, dirt may accumulate, and there is usually a bad smell. Rubber
prepared under these conditions is always liable to be below the high
standard which should be attained, and the general tone of the factory is
depressing.
PLENTY OF LIGHT.--The old idea that light must be excluded is now known to
be erroneous; so that in designing a factory, provision should be made for
ample light and air. It should not be forgotten that in tropical climates,
iron buildings may become uncomfortably hot, as most of our older factories
are. Usually it will be found that the ventilation is imperfect. There is a
lack of window space, and the roof is imperfectly ventilated. The ridge of
the roof should be opened up by means of a "jack-roof," so that the warm
air rising naturally may escape at the highest point of the building. These
are defects which should be remedied in old buildings.
As a rule no rubber remains in the factory at night-time, except in the
form of coagulum, the loss of any of which would be noted with ease. The
conventional idea of enclosing the factory with walls of galvanised
sheeting, wood, or brick, is not strictly necessary. In modern buildings
these walls are replaced by large-mesh expanded metal, thus making the
machine-room perfectly light and plentifully ventilated. Under such
conditions, dirt cannot accumulate unseen, and the general tone of the work
is raised.
THE FLOOR.--The floor should be of thick concrete, and have a good surface
layer of cement. Preparations are now advertised for which claims are made
that their employment renders the surface of such floors waterproof and
dustproof. If these claims can be substantiated when the use is applied to
the floors of rubber factories, the employment of a preparation of this
nature should result in a considerable saving of expense and trouble.
Preferably the floor should not be flat, but should slope slightly from the
longitudinal middle of the building to the sides on either hand. If the
floor is level it usually results in accumulation of water, the cement
breaks in patches, and the factory always appears to be dirty.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account