The Railway Builders: A Chronicle of Overland HighwaysSkelton, Oscar D. (Oscar Douglas)
History
The Railway Builders: A Chronicle of Overland Highways
Skelton, Oscar D. (Oscar Douglas)
Pacific railroads; Railroads -- Canada -- History
A glowing prospectus was drawn up. The amalgamated road would be the
most comprehensive railway system in the world, comprising 1112 miles,
stretching from Portland and eventually from Halifax (by both the
northern and the southern route) to Lake Huron. The whole future
traffic between west and east must therefore pass over the Grand Trunk,
as both geographical conditions and legislative enactment prevented it
from injurious competition. 'Commencing at the debouchere [_sic_] of
the three longest lakes in the world,' the prospectus continued, 'it
pours the accumulating traffic in one unbroken line throughout the
entire length of Canada into the St Lawrence at Montreal and Quebec, on
which it rests on the north, while on the south it reaches the
magnificent harbours of Portland and St John on the ocean.' It was
backed by government guarantee and Canadian investment, and its
execution was in the hands of the most eminent contractors. The total
capital was fixed at L9,500,000 sterling. The revenue was estimated at
nearly L1,500,000 a year, which, with working expenses at forty {79}
per cent of revenue, and debenture interest and L60,000 for lease of
the Atlantic and St Lawrence Railway deducted, would leave L550,000 or
11 1/2 per cent on the share capital.
On the advice of Baring and Glyn only half the capital was issued at
first. This decision proved a serious mistake. In 1853, when the
company was floated, money was abundant and cheap; the shares and bonds
issued were over-subscribed twenty times, and were quoted at a premium
before allotment. Scarcely was the issue made when war with Russia
loomed up, and money rose from three to seven or eight per cent. Never
again was it possible for the Grand Trunk to secure capital in such
abundance.
But this was for the future to disclose. At once construction began in
Canada. A. M. Ross was appointed chief engineer, and S. P. Bidder
general manager, both on the nomination of the English bankers and
contractors. Plant was assembled in Canada, orders for rails and
equipment were placed in England, and navvies came out by the thousand.
At one time 14,000 men were directly employed upon the railways in
Upper Canada alone. In July 1853 the last gaps in the St Lawrence and
Atlantic had been filled up, though not {80} in permanent fashion. In
1854 the Quebec and Richmond section was opened; in 1855, the road from
Montreal to Brockville and from Levis to St Thomas, Quebec; in 1856,
the Brockville to Toronto and Toronto to Stratford sections. Not until
1858 was the western road completed as far as London. The year 1859
saw the completion of the Victoria Bridge, the extension from St Mary's
to Sarnia, and a new road in Michigan, running from Port Huron to
Detroit. By 1860 the eastern section extended to Riviere du Loup,
where a halt was made.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account