The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
The task was commenced in 1896, and railway construction was
pushed forward with such spirited energy that Kerma, at the head
of the cataracts, was gained in a short time. No great engineering
difficulties were offered because the desert is tolerably level, and
the sand provided a good foundation for the steel sleepers, or ties,
with the minimum of ballasting. The greater question was to maintain
the steady supply of requisite material southwards from Alexandria.
Yet an average speed of two miles per day was maintained, the rails
being laid for the most part by natives, assisted by both British and
Egyptians, under the military engineers.
The objective was Abu Hamed, where the Nile describes a big elbow, and
at that time this point was in the hands of the enemy. Its capture,
however, by the Anglo-Egyptian troops resulted in a speeding-up in
constructional work on the advancing railway, and the 80 miles of line
into this town were laid in about two months. Clinging to the east bank
of the river, it was driven southwards to Atbara, where a halt was
called, and where the headquarters were established for the Omdurman
campaign. Curiously enough, although the railway has reached the
capital of the Sudan, Atbara has not yet lost its importance from the
railway point of view, being the administration centre for the whole
Sudan Government railway system.
At this place the Nile is swelled by the waters of the Atbara River,
which flows in from the east. While the campaign was in progress
communication between the opposite banks was maintained by means
of a wooden bridge. As the river, however, is tempestuous when in
flood, during which period it rises to a high level, a more permanent
structure was demanded for the iron horse. The width of the waterway
called for the erection of over 1000 feet of steel bridging. When the
advance of the railhead was determined, it was decided to rush the
railway across the river before it once more rose in flood. Tenders
were invited, only to be received with dismay, because it was found
that the structure required was of such an elaborate character that no
English firm would undertake to complete it within two years.
[Illustration: CONSTRUCTION TRAIN ON THE WAY TO THE RAILHEAD CROSSING A
TEMPORARY TIMBER BRIDGE]
[Illustration:
_Photos by courtesy of A. L. Lawley, Esq._]
THE LONGEST BRIDGE IN AFRICA, 1,300 FEET IN LENGTH, ACROSS THE KAFUE
RIVER
THE CAPE TO CAIRO RAILWAY]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account