The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
This upset official calculations severely, and accordingly fresh
tenders for a simpler type of bridge were called. The task was
thrown open to the world, and celerity of construction was the
primordial condition. The British firms re-tendered, but to their
disgust they were beaten hopelessly both in regard to the cost of the
structure and the time in which it could be erected by the American
engineers. The result was that the contract went to a Philadelphia
firm. Five weeks after the receipt of the order the steel-work left New
York, and within a further few weeks communication across the river was
provided by 7 spans of steel, each 147 feet long, resting on cast-iron
cylinders.
[Illustration:
[_See page 164_
THE “HANGING BRIDGE,” ONE OF THE RAILWAY ENGINEERING WONDERS OF THE
DENVER AND RIO GRANDE, IN THE ROYAL GORGE OF COLORADO]
The most remarkable feature about this contract was the public outcry
that ensued. British methods were held up in comparison with American
hustle, much to the disparity of the former. British builders were
assailed as lethargic, wedded to obsolete methods, and consequently had
suffered the penalty of such conservatism by being beaten in a most
hollow manner. The same critics, however, failed to shriek so loudly
in acclamation a year later in appreciation of a British firm which
accomplished a feat which even startled the Americans. This was in
connection with a bridge of five spans, each 105 feet long, which was
turned out of a Midland shop to replace the structure which had been
destroyed by the Boers across the Tugela River in Natal. Both British
and American engineers were invited to tender, and the American firms,
despite their wonderful organisation, hustling methods, and their
remarkable facilities for accomplishing quick work, were dismayed to
find that they had been beaten by their British rivals as hollow as
the latter had been vanquished some months before. The successful firm
rolled 100 tons of steel, had it inspected, tested and passed by the
Natal Government engineer in eight hours. It had undertaken to deliver
the first span within six weeks of the receipt of the order--as a
matter of fact, it was completed within nineteen days. The Americans
themselves admitted that the British performance was wonderful, and
that complete revenge had been taken for the Atbara contract.
As the railway pushed its way towards Khartoum, the ranks of the
labourers were swelled by large numbers of dervishes, who had grown
disheartened at the result of their resistance to the British advance
on the northern borders of the Mahdi’s stronghold, had realised the
impotency of their efforts, and consequently had decided to throw in
their lot on the railway. The increased labour enabled the work to be
prosecuted even more energetically, though a certain amount of time was
lost in drilling this raw material into the mysteries of wielding the
white man’s tools.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account