Some years later the Commonwealth sanctioned the completion of
a more exhaustive survey, Mr. H. Deane, M.INST.C.E., formerly
engineer-in-chief to the New South Wales railways, being placed in
charge of the whole undertaking. The enterprise was divided into two
sections, the Federal Government undertaking to complete the task from
Coolgardie to the eastern frontier of Western Australia, while South
Australia decided to complete the work so far as it affected its own
territory. Mr. John Muir, who had been through the country previously
for the Western Australian Government, was selected by the chief
engineer as first lieutenant on the former division, and he enrolled
four other surveyors.
For this task no less than 91 camels were acquired. Of this total 36
animals were deputed to haul three team-wagons, a like number were
subdivided into three strings of pack-animals, three carried stakes for
locating the line, while the others were used for various purposes.
An important task was the distribution of stores to the extent of 18
tons along the route for the survey party, together with ample supplies
of water for both man and beast, the water stations being spaced at
intervals of 7 miles.
To plot the route the chief surveyor set out ahead of the main party.
He ran the line by the aid of a compass, and checked his work by means
of stellar observations. The last camel in his train was required to
haul a heavy bullock-chain, the free extremity of which was knotted,
and as this dragged over the ground it left a trail which could be
picked up and followed easily by the main party following in the rear.
The latter measured the distance by chains and took levels at frequent
points, and these were checked constantly. This survey party moved
forward at the rate of 6 miles per day, and it covered the Western
Australian section of 455 miles in 89 days.
The South Australian Government engineers experienced greater
difficulty in completing their part of the work, for on their section,
extending over 608 miles, the scarcity of water was felt acutely. They
were caught by the intensely hot summer, which dried up all available
founts of supply speedily, and consequently the men and the 80 camels
could not advance very rapidly, their daily movement averaging about 3
miles. In due course they gained the inter-state boundary and picked
up the last stake indicating the route left by the party which had
advanced westwards from Kalgoorlie.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account