The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
A sum of £20,000, or $100,000, was expended upon this preliminary work.
In addition to location, other valuable details were secured, the most
important of which was in regard to the economic possibilities of the
territory traversed. Far from much of the country being sterile, as
previous reports had indicated, it was ascertained that, under proper
scientific farming, it could be brought to a high standard of fertility
and productiveness. There is one long doubtful stretch of 107 miles
through a waterless plain, but if it were possible to adopt irrigation,
there are great hopes that this country might be found excellent for
grazing purposes.
The standard gauge was advocated for the trans-continental highway,
and it was pointed out that if this connection were forged, not only
would the line prove of distinct military value, but that it would
possess great commercial attractions as well. For instance, there is a
considerable and increasing trade between the Coolgardie gold-fields
country and the eastern States, which has to be carried out by steamer
at present, involving a long, tedious journey, whereas by rail the
two centres would be brought within direct and accelerated connection
of one another. Another feature was emphasised also, and that was the
great saving in time possible by dispatching the European mails and
passenger traffic overland from east to west, instead of by sea as at
present.
The Commonwealth appears resolved to carry the scheme to fulfilment,
especially in view of Lord Kitchener’s strong advocacy of the project,
and when this is accomplished passengers landing at Fremantle will be
able to travel by rail so far as Rockhampton in Queensland, a distance
of 3,800 miles. Owing to the varying gauges in Australia, such a
journey would involve no less than five changes of carriages at least,
and this is the one great disadvantage connected with the scheme.
In order to observe railway engineering in its most spectacular form
in the Antipodes one must cross the Tasman Sea into New Zealand. The
England of the South is provided with a backbone of lofty and extremely
broken ridges. Indeed, the advance of the railway-builder through
this country has been beset with abnormal obstacles which recall the
conquests of the Rocky and Cascade mountains in North America. The
most outstanding feature on the whole network of railways operated by
the Government is the amazing number of bridges, the cost of which
must represent a huge sum. In the early days chasms and gorges which
the railway was forced to cross were spanned by wooden structures, but
these have since been replaced by substantial and often lofty steel
structures. Whenever the engineer has essayed to leave the coast on
either side of the island, the mountains have reared up to dispute his
advance, and it has been only by dint of great effort that the metals
have been carried over these great barriers.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account