The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
However, no time was lost in placing the undertaking upon a firm
footing. Within two months of the acquisition of the railways a
large staff of men for both the administration and engineering sides
of the enterprise were dispatched to South America, with Mr. F. W.
Barrow as general manager and Mr. Norman B. Dickson, M.INST.C.E., as
engineer-in-chief. The engineer was commanded to overhaul the whole
network, to reconstruct it if necessary, so that the lines might be
capable of meeting the exigencies of the traffic awaiting creation from
the development of the country.
At that time Rio de Janeiro was an insalubrious city--in fact, it was
almost a graveyard for Englishmen. Mr. Dickson found this out in a very
short space of time. The company lost three accountants and a number of
British assistants under the malignant scourge that prevailed--yellow
fever. Since those days Rio de Janeiro has made great strides and has
undergone extensive improvement. The city has been rebuilt, and has
been provided with a complete sanitation system, to bring it into
line with the other great ports of the world. But in those days it
was absolutely untenantable from the white man’s point of view, and
the railway authorities were compelled to provide accommodation for
their imported staff in a healthy spot outside the city, where the
men underwent what might be described as a process of acclimatisation
lasting over eighteen months.
The first few years were strenuous to the engineer-in-chief. He was
confronted with a formidable task on all sides. The line is of metre,
or 39.3 inches, gauge throughout, and had been built in a somewhat
flimsy and haphazard manner. The majority of the bridges and culverts
had been erected of timber, the greater part of which either had
reached, or were approaching closely, the span of life. These had to
be replaced by permanent structures in masonry or steel. The track,
too, had to be overhauled from end to end, reballasted, provided with
new sleepers and rails, and at frequent points where it was in an
exposed position, and liable to suffer from the peculiar visitations
which wreak such widespread destruction in that country, had to be
strengthened and protected by heavy retaining walls and revetments of
masonry.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account