The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
Yet the Brazilian engineers had attempted a daring engineering work in
the first instance. The configuration of Brazil is somewhat peculiar.
A few miles from the coast, and running roughly parallel with the
water-line, is a rugged range of mountains dividing the low-lying
stretch of shore from the fertile highlands in the interior. The
mountain ridge is not regular, but is badly broken up, forming, as
it were, a succession of walls placed one behind the other. In order
to gain the interior, and owing to the abrupt nature of the ascent,
the line has to climb sharply, at the same time winding in and out
among the clumps of mountains in a bewildering manner. In fact, the
differences in level are so sudden that the track could be lifted only
by means of resort to the rack rail, and other devices such as are
adopted in Switzerland to ascend the steep mountain slopes.
For instance, after leaving the coast, the first ridge is met within
30 miles, and in the course of 5 miles the line has to rise some
3000 feet. This involved the use of grades varying from 15 to 18 per
cent.--from 1 in 6⅔ to 1 in 5-5/9--and when first laid down the line
was worked upon the Riggenbach system.
It is worth while to recall that it was on the low-level part of this
section to Petropolis that the iron horse made its first appearance in
South America. The short length of line, representing about 13 or 14
miles, between Maua and Raiz da Serra was the first stretch of railway
to be laid and used on the continent south of the Equator.
[Illustration: A STEEP BANK SHOWING THE CENTRAL RACK RAIL]
[Illustration: TRAIN ON THE RACK SECTION OF THE PETROPOLIS DIVISION,
SHOWING THE CURIOUS TYPE OF LOCOMOTIVE ADOPTED
HOW THE LEOPOLDINA RAILWAY OVERCOMES HEAVY GRADES]
On another part of the system--the line running inland from Nictheroy,
on the eastern side of the bay of Rio de Janeiro--the Brazilian
engineers were compelled to overcome one of the most searching problems
in railway engineering in the world. After traversing forty miles of
the level country, the mountain ridge barred their way. They realised
that it could be surmounted only by some exceptional system, and the
local authorities seized a unique opportunity. The Mont Cenis tunnel,
connecting Italy and France, had been bored successfully, and this new
steel highway through the heart of the range displaced the construction
railway operating on the Fell system which had been laid over the
crest of the Cenis range. The Brazilian engineers thereupon approached
the Swiss authorities for the purchase of this abandoned stretch of
mountain line, and their offer was accepted. Thereupon the Mont Cenis
“Fell” railway was torn up, transported to South America, and pressed
into service to help the Brazilian engineers over the obstacle that
confronted them.
[Illustration: REBUILDING A BRIDGE ON THE LEOPOLDINA RAILWAY
The masonry structure had to be built beside the original iron
structure so as not to disturb traffic.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account