The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
When this part of the work was taken in hand the original arrangements
comprised tunnelling beneath a glacier and through the hump of Mount
Stephen, but as there was loud clamouring for the completion of the
line, this undertaking, which would have involved a great length of
time, and which would have proved exceedingly costly, was abandoned
for the time being in favour of a “temporary line.” That deviation,
however, fulfilled its temporary requirements for a prolonged period--a
matter of some thirty years to be precise--and only recently has been
improved.
[Illustration: IN THREADING THE FRASER RIVER CANYON THE ENGINEERS
WERE COMPELLED TO HUG THE WATERWAY, THOUGH IT INVOLVED THE BORING OF
NUMEROUS SHORT TUNNELS]
In making the deviation serious delays were experienced. A rocky
obstacle stood in the way and tunnelling was commenced, but this work
had to be abandoned owing to the collapse of the burrow, and a sharp
curve and heavy bank introduced. The result was that it was found
impossible to comply with the Government’s requirements concerning the
maximum gradient, because in order to descend from Hector to Field,
a distance of about 10 miles, a difference of 1,143 feet had to be
overcome. This introduced a grade adverse to eastbound traffic of
237 feet to the mile, and it proved a heavy stumbling-block against
the economical operation of the line for many years, and one which
increased in severity with every succeeding year.
Yet the conquest of the Rockies was a marvellous piece of engineering,
especially on three miles of this bank, which was so steep as to earn
the name of the “Big Hill,” for it rose 12 inches in every 22 feet,
and was one of the stiffest pieces of road to be worked by adhesion
that ever had been laid down on a railway. It was so steep as to be
dangerous, a fact testified by the number of safety switches, or “catch
points,” that were introduced. The man in charge of one of these
points, observing an engine coming down-hill, did not know whether it
had run away or not until the engine-driver whistled a signal which
conveyed the information that he desired the switch to be set to the
main line, for normally it was left open and a runaway at that point
would have been turned into the bank, to end its mad career in a wreck.
Now and again engines did run away, and the “Big Hill” has witnessed
many exciting escapes among the engine-drivers and train gangs. To
grasp the significance of this engine “pull,” one required to see the
“Limited” steaming from the Pacific to the Atlantic. It got to the
bottom of the hill, and there three other engines were attached to the
train to push it up the ever-dropping metals for over three miles,
while the clouds of smoke and live cinders belched into the air, and
the terrible roar of the engines straining at the load testified to the
tremendous effort that was required to get a speed of five miles an
hour on the train. It was this feature that led a humorist to remark
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account