that the Canadian Pacific railway never had any occasion to ballast
the track on the “Big Hill.” The engines performed this operation
spontaneously and automatically in their labour, and to far better
effect than would have been possible by ordinary means.
Considerable excitement was experienced in its construction. According
to some of the men whom I met, and who had been connected with the
grading through the Kicking Horse Pass, the ballast trains failed
time after time to secure a grip on the metals, and with their
driving-wheels spinning round madly in the forward direction they
skidded backwards down-hill. Now and again there would be a nasty
smash, in which engine and the ballast cars were mixed up in an
inextricable heap. It is reported even that on one occasion, while the
snow-plough was out clearing the drift on the “Hill,” the driver of the
locomotive lost the plough, and did not discover the fact until he had
gained the top, although he was pushing the snow-clearing apparatus! It
was so difficult to keep the wheel gripping the rails that he did not
notice the difference in the resistance when the snow-plough went over
one side.
From the Government’s strict point of view the Canadian Pacific was not
completed until about two years ago, although trains have been running
between the Atlantic and Pacific for some thirty years. The authorities
pointed out that the grade was an essential part of the contract, and
yet, in order to pass through the Kicking Horse Pass, the company had
exceeded that grade to a very considerable extent. Consequently eight
miles of line was non-existent so far as the Government was concerned,
and it declined to contribute any subsidy to that short length of
the railway. Two years ago compliance was made with the Government’s
agreement. The route through the Kicking Horse Pass was re-aligned.
This piece of work was carried out by the late J. E. Schwitzer,
and from its daring nature it will always stand as a monument to
his engineering ability. He cut out the “Big Hill” entirely. Where
previously a bank rising 1 in 22¼ existed for 4.1 miles, he provided a
stretch of line double the length and of one-half the gradient, so that
the engines only have to overcome a climb of 1 in 45½.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account