In a far-away corner of the same country, Upper Burma, may be seen
another interesting example of the bridge-builder’s craft, carried out
under particularly exacting conditions in a forbidding country. This
is the Gokteik Viaduct, which carries the metre-gauge single track
of the Burma Railway Company across the gorge of the same name. This
structure was completed by the Pennsylvania Steel Company, of Steelton,
Pennsylvania, and the award of the contract was criticised severely
in Great Britain. But the Government wanted the valley spanned in the
shortest possible space of time and at a moderate price. When the
tenders invited from all parts of the world were opened, it was found
that the British firms had been outclassed by their American rivals in
both these essential factors.
The location of the railway across this gorge was beset with peculiar
difficulties. The question of the approach was trying to decide to the
best advantage, and in fact so many surveys were made that one of the
American engineers remarked “that he could not see the side of the
cliff for survey pegs.”
[Illustration: THE TRAINING-BUND UNDER CONSTRUCTION BY NATIVE LABOUR.
AT THE EXTREME RIGHT A PIER IS BEING BUILT FOR THE BRIDGE]
[Illustration: GENERAL VIEW OF THE PIER-BUILDING OPERATIONS FOR THE
CURZON BRIDGE ACROSS THE GANGES AT ALLAHABAD
The bridge is 3000 feet long. Temporary line at right.]
The gorge itself is also somewhat strange; in fact, it is a curious
wonder of Nature. The Chungzoune River flows through the rift, but
out of sight, its course being through a natural tunnel, into which
it disappears suddenly at a depth of 500 feet. When the line was
first surveyed it was in accordance with a low viaduct, the approach
thereto being over a suggested section of rack railway working on the
Abt system, with grades of 1 in 12½. This was subsequently abandoned,
and the surveyor was called upon to find a fresh location so as to
eliminate the rack railway, and to give grades not exceeding 1 in
25, so as to permit the line to be worked by adhesion. This decision
raised the height of the towers by 70 feet and increased its length to
1,350 feet. Even this did not meet with approval, for after prolonged
deliberation a third location was demanded, to give an easier line yet.
In this last survey the gradients were flattened to 1 in 40, with an
attendant increase in the height of the structure as well as of its
length. It was found impossible to improve upon the viaduct itself, so
further surveys were carried out to improve the approaches, reducing
their length and introducing curves at either end of the viaduct.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account