At last finality was reached, and the contract was secured by the
American bridge-builders on April 28, 1899. They lost no time in
hurrying forward the preparation of the steel. Three months later a
special train of 45 cars, laden with 977 tons, left Steelton on the
201-miles run to New York, where a specially chartered steamer was
in waiting to receive this steel cargo. The vessel left the American
port on a journey of over 10,000 miles to Rangoon, where the freight
was transferred to the small trucks of the railway and sent on the
up-country journey of 460 miles to the Gokteik gorge. No less than
three steamers were required to transport the 4,308 tons of steel,
together with some 200 tons of requisite tackle for erection, and 35
American bridge-erectors.
When the Americans arrived on the scene they were treated to their
first experience of Indian weather. The rain fell in torrents; the
roads were converted into rushing streams, and the low-lying stretches
of land into lakes. This was something new to the Americans, and
they chafed at being compelled to sit down to wait until the weather
moderated. To make matters worse, the line was knocked about severely
by the rain, no less than thirteen wash-outs occurring between the
coast and the gorge. In one place a locomotive got caught. It could
not advance and could not retreat, owing to breaches in the railway
on either side, so quietly settled down to rest in the waterlogged
embankment, and finally slipped into a field of rice, to the intense
disgust of the owner.
The result was that the port became congested with the steel and
tackle awaiting dispatch up-country. The railway company repaired the
wash-outs with all possible speed, and directly the line was opened
the material poured towards Gokteik in a ceaseless stream. In fact,
the American engineers were somewhat perplexed by the speed with which
the material was sent up, and they had a spirited task in sorting out
the pieces of steel as they arrived. The work proceeded so feverishly
that the empty trains could not be backed out of the shunting-yard
with sufficient alacrity to admit incoming loads. The bridge-builders
extended assistance in a novel manner. Shunting was abandoned. The
large steam derricks picked up the empty cars bodily off the one track,
whipped them round, and deposited them upon a siding, from which the
engines pulled them out as best they could.
[Illustration:
_Photo by permission of Pennsylvania Steel Co._]
THE GOKTEIK VIADUCT UNDER CONSTRUCTION
The railway track is 825 feet above the level of the Chungzoune River,
which flows through a tunnel beneath the bridge.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account