The outcome was the production of some decidedly startling facts, even
to those who were convinced of the extremely inclement conditions
prevailing inland. The observers had been instructed to record
particularly the maximum fall of snow during twenty-four hours, the
depth of the snow among the mountains during the winter, and the
effect of the winds which swept the plateau mercilessly during the
latter season. It was found that snow fell every month during the year
at Fjeldberg, even June, July and August not being free from such
visitations, while at another point the snowfall in winter aggregated
no less than 11 feet. At no point along the projected location of
the line was a depth of less than 8 feet recorded, while the general
average was from 10 feet to 14 feet.
The winds were found to drive the dry, fleecy flakes before them like
dust, to pile up huge drifts in sheltered places, running up to 161
feet deep. Some of these drifts remained throughout the summer, and
were found to be of respectable proportions. The sum of these reports
presaged the fact that, when the line was completed, the question of
maintaining it free from snow-blocks would demand superhuman effort.
At last the Government decided to proceed with the undertaking. The
advantages and disadvantages of the various locations had been weighed
diligently, and promoted the decision to adopt the Gravehals route.
The authorities regarded this location with misgiving in the first
instance, because it involved the piercing of a tunnel 17,420 feet in
length, at an elevation of 2,818 feet. Funds were voted to build the
next section from Vossevangen to Taugevand, a distance of 47 miles.
In this distance the line was to be lifted a matter of 4000 feet to
the highest point to be attained between the Atlantic seaboard and
Christiania.
The route selected comprised the boring of no less than 12 tunnels,
making in the aggregate not less than 11¼ miles, of which the Gravehals
tunnel represented over 3 miles. While this difficult section was being
prosecuted, the Government resolved to come to a definite conclusion
as to the route the railway should follow after attaining the summit
at Taugevand, so as to enable operations to be continued without delay
when the latter point was reached.
The exposed position of the Gravehals tunnel rendered the work
exhausting to the men. As the timber line is about 2000 feet below,
the mountain-sides are quite bare, and there is no protection against
the elements whatever. The work is the longest of its kind in Northern
Europe, and has proved probably one of the most exacting to construct.
It extends through granite which was found to be exceedingly tough, so
that boring was unavoidably slow, especially at times when everything
appeared to be pitted against the contractors.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account