The financial arrangements completed, the company had to search for a
man to bore the tunnel. For this purpose tenders were sought for the
whole contract. The terms of the latter were severe, as were also the
technical conditions. The tunnel was to carry a double track, to have a
height of 19.68 feet to the crown of the arch, and a maximum width of
26.24 feet, with a minimum width of 24.93 feet. The tunnel was to be
quite straight, with the exception of a slight curve at the southern
end, where, for a distance of 474 feet from the entrance, a curve of
984 feet radius was to be introduced to gain Airolo station. The rise
from the northern entrance was to be about 1 in 172 to the summit
level 3,781 feet above the sea, followed by a drop of 1 in 1000 to the
southern end. These gradients falling on either side from the centre
were necessary for drainage, and were estimated to be just sufficient
to ensure the water flowing to the portals.
Seven tenders were submitted for the enterprise, the lowest being
that of L. Favre, a well-known engineer of Geneva, who had completed
many notable railway works in Europe. He undertook to complete the
tunnel for £2,000,000 ($10,000,000) within eight years. His nearest
competitor, an Italian company, wanted twenty-five per cent. more, but
would not guarantee completion within less than nine years. Monsieur
Favre was supported by a body of influential capitalists, and the
contract was awarded to him.
Having sanctioned the project, the Government was determined that it
should be completed, and resolved that the engineer should be held to
his self-appointed time limit. The penalty it stipulated was exacting.
For every day over the ninth year Favre was to forfeit £200, or $1000,
for six months, and then double that penalty per day until completion.
A year was thus allowed over and above what he demanded to cope with
any unforeseen contingencies that might arise during the progress of
the task. Similarly, M. Favre was to receive a premium of £200, or
$1000, a day for every day he was in advance of the stipulated period.
His Italian competitor, while agreeable to the forfeit, stipulated that
it should not be enforced until after the eleventh year, which terms
the authorities refused to entertain. To ensure securing the forfeit
money should the engineer be late, Favre was compelled to deposit a sum
of £320,000 ($1,600,000) with the Government before a stone was moved.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account