By the most direct route of this system the journey from the Austrian
capital to Trieste occupies nine hours. In that journey, comparatively
no longer than that entailed in speeding over the greater distance
separating London from Edinburgh, one passes through four distinct
expanses of scenery. Vienna nestles in a broad valley flanked on all
sides by the towering snow-topped Alps. The line, upon leaving the
capital, first traverses the undulating foot-hills, then wends its way
through the mountains to gain the richly wooded, verdant and beautiful
country of Styria, and finally passes over a vast stretch of wilderness
to descend abruptly to the coast.
In forging this link in the railway chain the engineers had to overcome
the Semmering range, which is amongst the most tumbled in the whole
of the Austrian Alps. How did they do it? By following the natural
facilities open to them: a ledge here, a gallery there; passing from
this slope to that by a viaduct or bridge; zigzagging up the mountain
slopes; tunnelling through rocky eminences; following winding paths
for miles merely to gain points only a mile or two apart in a straight
line. No doubt if that line were built to-day it would have its length
cut in half, for railway engineering has advanced by leaps and bounds
since 1848, when this pioneer project was taken in hand.
In carrying their scheme to fulfilment these early engineers
unconsciously achieved one notable distinction: they built the first
mountain railway. What matter if banks did assume a rise of 132 feet or
so per mile, and the line did wander in apparent aimlessness among the
peaks? Speed then was not the vital consideration it is to-day, while
traffic was comparatively light, so that the haulage facilities were
not taxed severely.
This mountain climb on the main line occurs between Gloggnitz and
Murzzuschlag, the famous winter sporting centre in the Tyrol. The
mountain crest is 4,577 feet above the sea-level, but the railway does
not rise to that height; its summit is at 2,940 feet in the middle of a
tunnel three-quarters of a mile in length beneath the Semmering Pass.
But to gain that altitude from either side of the mountain entailed
prodigious work. Pick, shovel, and gunpowder made heavy cuttings
through projecting spurs, raised lofty embankments, filled gaping
fissures, and cleaved galleries out of the solid rock. The two points
on either side of the mountain are only fourteen miles apart in a
straight line; by the railway it is more than twice the distance, the
outstanding features which were necessary to render the undertaking
_un fait accompli_ being fifteen tunnels, and a score of viaducts and
bridges. To construct the thirty miles over the Semmering cost a round
£2,000,000, or $10,000,000, in money, and occupied between three and
four years to complete.
[Illustration: THE WORKMEN CUTTING AND BLASTING A NARROW PATH ON THE
STEEP MOUNTAIN SLOPES FOR THE KARAWANKEN RAILWAY]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account