With the march of time, however, the traffic over this railway
increased, hand in hand with the expansion of Trieste, to such an
extent that it proved inadequate. A more direct route between the
capital and the port, as well as accelerated communication with the
great centres of Europe, was demanded by the commercial community. This
agitation became so insistent that at last the government was compelled
to move, and the engineer of the Imperial Railways was commissioned
to survey the country for the purpose of devising some scheme which
would satisfy the public outcry.
[Illustration: THE MASSIVE STEEL BRIDGE WHICH CARRIES THE RAILWAY
ACROSS THE DRAVE RIVER TO APPROACH THE TUNNEL THROUGH THE KARAWANKEN
RANGE IN THE BACKGROUND.]
[Illustration: THE NORTHERN ENTRANCE TO THE KARAWANKEN TUNNEL.
Five miles in length, through the Karawanken mountain chain.]
This was no easy task. Innumerable knots of mountains break up the
country between Vienna and the Adriatic, and they are compressed so
tightly together that the narrow valleys between offered but slight
assistance towards the solution of the problem. Then, again, those
three well-known mountain ranges, the Tauern, Karawanken, and Julian
Alps, stood right in the way, disputing any possibly shorter route than
that already in existence.
The prospect before the surveyors was not very promising. However, they
braved the elements among the inhospitable peaks, suffered extreme
privations and fatigue as they toiled up and down the rugged, wild
mountain slopes with their instruments, for month after month. At
last they succeeded in formulating a project which was submitted to
Parliament. In this it was proposed to make avail of any favourable
stretches of existing railways which intersected the valleys in
all directions, and to connect them together, so that in the end a
tolerably direct route might be obtained. At any rate this proposal
would reduce the journey between the Adriatic and Munich by at least
eleven hours. The scheme was divided into four broad sections. It was
discussed thoroughly in Parliament, but in the end it was decided
to carry out in the first instance the most essential parts of the
project, because embarkation upon the undertakings as set forth by the
engineers would have entailed the expenditure of a gigantic sum of
money. Even that which was sanctioned represented a total financial
commitment of about £30,000,000, or $150,000,000, for 211¼ miles of
line.
The accepted enterprise was memorable because it entailed the piercing
of three mountain ranges by tunnels 5¼, 5, and 4 miles in length
respectively. Of the total mileage only 41¼ miles were to be level! The
remaining 170 miles represented banks, with grades running as high as
132 feet to the mile.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account