The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
Gaining the river-bank, the line sweeps across the waterway by a
majestic lofty iron bridge 656 feet in length. Gaining the opposite
bank, it plunges among the well-wooded slopes of the Karawanken belt
of mountains, effecting a good climb up and down towards the Rosenbach
valley, which is crossed by means of a long viaduct, consisting of four
arched masonry spans each 24 feet and three steel spans of 177 feet
apiece, at a height of 170 feet.
The ascent is heavy, as the objective is the northern entrance to the
Karawanken tunnel, which burrows through the range for a distance
of five miles. The piercing of this subterranean passage excited
considerable attention. The Austrian engineers who had achieved such a
triumph in the rapid boring of the Arlberg upheld their reputation as
accomplished masters in this phase of railway-building, notwithstanding
the fact that the rocky mass was found to be of such unstable character
that the tunnel had to be lined from end to end.
The task was taken in hand shortly after the Austrian Government
sanctioned these railways in 1901. Boring was carried out
simultaneously from each end. The ground around each portal was quickly
cleared, and when the work was in full swing 6000 men found employment.
The first step was to secure power to furnish the energy to operate
the variety of mechanical appliances that were necessary to dislodge
and transport the rock, as well as to dispel the Cimmerian gloom in
the heart of the mountain. There was a small waterfall six miles from
the proposed southern mouth of the tunnel, with a drop of 35 feet, and
capable of furnishing some 900 horse-power. This picturesque Alpine
cascade was harnessed and compelled to drive turbines and dynamos to
generate electricity, which was transmitted by overhead wires for six
miles to the boring works at the tunnel entrance. Here the current was
pressed into a multitude of services, not the least important of which
was the driving of the huge fans, whereby a great volume of clean,
pure, cool air was swept in a steady stream through the shaft to strike
against the wall of rock upon which the drillers were concentrating
their energies, displacing the atmosphere contaminated by the fumes of
the dynamite blasting, grime and dust. Moreover, the temperature, which
rapidly rose as the heart of the mountain was penetrated, was tempered
pleasantly by the incoming currents, so that the fatigue of toiling in
the blackness and confined space was reduced.
[Illustration: THE TAUERN RAILWAY, SHOWING WINDING CHARACTER OF THE
LINE]
[Illustration: THE ENTRANCE TO THE TAUERN TUNNEL,
Five and a quarter miles in length, which occupied five years to bore
through the range
RAILWAY BUILDING IN THE TYROL]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account