The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
The project as sanctioned was divided into three sections for
constructional purposes. The first section is that known as the Pyrhn
railway, which connects the main line between Vienna and Switzerland
via the Arlberg tunnel at Linz. From this point a short branch line
ran directly southwards through the Krems valley to Klaus, having been
built for tourist purposes. It was decided to overhaul this spur to
bring it into conformity with the conditions of a main line, and to
build the new line onwards from Klaus.
From Auspoint, which is at an altitude of 1,563 feet, the line makes
one continual climb, climb, to the Selzthal terminus, nearly 40
miles distant. The average rise ranges from 70 to 132 feet per mile
to overcome the Pyrhn Pass, beneath which a tunnel nearly 3 miles
in length was bored. This tunnel, however, is only one of many, for
there are numerous short burrows through shoulders and crags. Nor are
the bridges a whit less majestic. The Steyr River is crossed by a
lofty single masonry arch, and again lower down by an iron suspension
structure, while the Teichl is spanned by a single-span lattice
steel bridge. The loftiness of these structures is an outstanding
characteristic. The rivers at the points in question have cut their
beds at a great depth below the banks which constitute the railway
level. Swerving bends are also conspicuous, for the railway continually
swings from one side of the valley to the other.
The construction of the Pyrhn railway, however, was simple in
comparison with the other links of this chain of communication. At
Klagenfurt, south-east of Vienna, commences the Karawanken railway, so
named because it pierces the difficult mountain range of that name. The
stretch is only 19 miles in length, but the country proved to be so
broken that only 4 miles of level track could be introduced, and those
in the vicinity of the stations! Throughout the remaining 15 miles the
railway is really a gigantic switchback.
The line hugs the hill-sides, and has to make the rough descent of the
broken Hollenburger in order to gain the level of the Drave River, to
pass between the Stattnitz on the northern and the Karawanken chains
on the southern side of the depression. The mountain-side is steep and
broken in the extreme. In all directions gullies extended, where the
soft earth had been washed away by the violence of the snow freshets.
These had to be filled in with solid, heavy embankments, the debris for
which was torn from deep cuttings through projecting humps of rock.
Some of the gaps were too wide and deep to be overcome in this summary
manner, and had to be bridged. The Hollenburger viaduct stands out
prominently among works of this kind. From end to end it measures 262½
feet in length, and in the centre the rift is 92 feet below the level
of the rails. The mountains sheer up precipitously on the one, and the
beautiful valley of the Rosenbach falls away on the other, side of the
track.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account