Work continued incessantly day and night; but it was hard and
exhausting the farther the men advanced. The drills scarcely could bite
into the rock, as it was so tough. At one time the question became
so acute that the engineers brought up the electric drills used in
the Karawanken undertaking in order to see if matters could not be
expedited, but they failed to make as much headway as the hydraulic
tools. Another handicapping factor was the heat, which rose very
rapidly, and although it did not attain that degree experienced in the
boring of the Simplon, yet it caused considerable fatigue among the
workmen engaged in such a confined space. The elaborate ventilating
system sufficed to keep the air as sweet and cool as possible, but it
did not solve the problem completely. The workmen, cramped as they were
in the confined space--the area available for manipulating the tools
only measured a few feet in each direction--often betrayed painful
signs of physical distress.
But at last there was a wild cheer, which echoed and re-echoed through
the caverns to the tunnel’s mouths. Those outside realised that
something untoward had occurred, and in a few seconds the news came
through the gloomy depths that the drills had pierced the last 72
inches of rock separating the two headings, and that the Tauern was
conquered. That was on July 21, 1907, some five years after the first
boulder was torn from the mountain-side. Once this last barrier was
broken down the finishing touches were soon applied, and the double
track laid from end to end.
Though the Tauern tunnel constitutes the outstanding features on
the section stretching from Schwarzach St. Veit to Villach, there
are innumerable other subsidiary works which in themselves are of
importance. One of more than passing interest is a clever piece of
construction in order to overcome a difference of 2,975 feet in level
between the Tauern tunnel and Ober Villach by means of a huge “S” loop
four and a half miles in length.
The fulfilment of this undertaking constitutes one of the most
remarkable railway engineering feats in Europe. Certainly it ranks
among the most expensive enterprises that ever have been attempted west
of the Urals. To the travelling and commercial community its value
is incalculable, for Munich, which was formerly a tedious journey of
twenty-three hours from Trieste, is now within twelve hours’ run, while
the other great centres of Europe have been brought proportionately
nearer the Adriatic by this new and more direct route.
CHAPTER VIII
THE RECLAMATION OF ALASKA
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account