The work upon the eastern division has been retarded from the
scarcity of labor. Time seems to be required to collect the necessary
force upon the line. With the exception, however, of the Susquehanna
bridge, the grading will be prepared for the superstructure, to
Lewistown, this year. The masonry of that important job was first
allotted to contractors. The principal of the firm, though highly
recommended by the officers of the Reading Railroad, proved unequal
to the task he had undertaken, and their contract was abandoned. In
consequence, the remnant of last season, after the contract was let,
was mostly lost.
The work has been re-let to Holman, Simons and Burke, who have
carried it forward satisfactorily. The prevalence of high water,
since the season for laying masonry commenced, has prevented as much
progress, at this time, as could have been desired; but we still
entertain hopes that it will be completed before the ensuing winter.
If this is accomplished, the Road can be opened to Lewistown next
spring. Under any ordinary circumstances it will be finished to
Huntingdon (98½ miles) by the close of navigation in 1849--a point as
low down as we may anticipate a profitable use of the Road from.
Our arrangements have been made with a view to the completion of
the Road to the Allegheny Portage, early in the spring of 1850. An
earlier period could not be fixed, owing to the magnitude of some
of the work on the Little Juniata; a portion of which, embracing
the tunnel, through a point of Tussey's mountain, was located
and contracted for last December, to avoid delay and a premature
expenditure of capital on the lighter work, which would have followed
a general letting of the whole Road at that time, or since, even if
it could have been prepared for contract in season.
If sufficient means shall be obtained to prosecute the western
division, I would recommend that the heavy portions of the work,
between the Conemaugh and the confluence of Brush and Turtle
creeks, should be placed under contract, together with the grading,
continuously from the Portage road to the point of divergence of the
line from that river towards Pittsburg, if the Conemaugh route is
adopted.
When the connection is made with the Portage Railroad, from the
east, there will then be a continuous railroad from Philadelphia
to Johnstown, 282 miles in length, and, if opened at the same time
to near Blairsville, it will be extended to 310 miles, with only
43 miles of turnpike thence to Pittsburg, or 75 miles of canal
navigation, giving a line of communication, with the Ohio river, far
superior to any railroad route existing, or any that will at that
time be built. On freight destined to the interior of Ohio but one
transshipment will then be necessary. The canal boats, loaded at the
terminus of the Road, can be conveyed to any point upon the Ohio
canal.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account