According to the "Manual of Military Railways," issued with Army Orders
dated March 1st, 1889, the duties likely to be required from the Royal
Engineers with regard to railways are as follows:-- (1) Laying, working,
and maintaining a military line of railway between two places; (2)
restoring an existing line which has been damaged or destroyed by an
enemy; (3) destroying an existing line as much as possible with a given
number of men and in a specified time, and (4) working and maintaining
an existing line. The "Manual" itself gave much technical information as
to the construction, maintenance, destruction and working of railways.
It was re-issued by the War Office in 1898 as Part VI of "Instruction
in Military Engineering," and was stated to embody a portion of the
course of instruction in railways at the school of Military Engineering,
Chatham. In the "Manual of Military Engineering," issued by the General
Staff of the War Office in 1905, instructions are given (Chap. XVII,
pars. 238-244) on the "hasty demolition, without explosives," of
railways, stations, buildings, rolling stock, permanent way, water
supply, etc.; and in Chapter XXIII, "Railways and Telegraphs," the
statement is made that--
The duties likely to be required of troops in the field with
regard to railways (apart from large railway schemes, for which
special arrangements would be necessary,) may be considered as
either temporary repairs or the laying of short lengths of line
to join up breaks, the construction of additional works, such
as platforms, etc., to adapt the line for military use, or the
demolition of an existing line.
Detailed information is given, for the benefit of R.E. officers,
concerning railway construction, repair and reconstruction, and the
main principles on which such work should be carried out for military
purposes are explained. The best system to adopt for the effecting of
rapid repairs is said to be that of establishing construction trains.
"The reconstruction staff live in these trains, which rapidly advance
along the line as it is being repaired, conveying, also, the necessary
material."
The peace training[35] of the Companies includes: reconnaissance, survey
and final location of a railway; laying out station yards; laying out
deviations; rapid laying of narrow-gauge "military" lines; construction
of all kinds of railway bridges; signal installation; water supply;
repairs to telegraphs and telephones necessary for working construction
lines; working of electric block instruments; fitting up armoured
trains; construction of temporary platforms, and working and maintenance
of construction trains.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account