The Rise of Rail-Power in War and Conquest, 1833-1914Pratt, Edwin A.
History
The Rise of Rail-Power in War and Conquest, 1833-1914
Pratt, Edwin A.
Railroads; Transportation, Military
If we turn now to the Sudan, we gain examples of military railways
which, designed for the purposes of war, and constructed, in part,
during the progress of active hostilities, first rendered great services
in facilitating the conquest of a vast area, and then developed into a
system of Government railways operated, in turn, for the purposes of
peace, and accomplishing results as conspicuously successful in the
latter direction as they had previously done in the former.
During the time that Saïd Pasha was Viceroy of Egypt (1854-63) there
was brought forward a scheme for the linking up of Egypt and the Sudan
by means of a single line of railway from Cairo to Khartoum, with a
branch to Massowa, on the Red Sea. It was an ambitious proposal, and,
if it could have been carried into effect, the opening up of the Sudan
to civilisation, by means of an iron road, might have altered the
whole subsequent history of that much-suffering land. But the cost was
regarded as prohibitive, and the scheme was abandoned for a time, to
be revived, however, in a modified form in 1871, when Ismail Pasha was
Khedive. It was then proposed that the line should start at Wady Halfa
and be continued to Matemmeh (Shendy), situate about 100 miles north of
Khartoum--a total distance of 558 miles. In 1875 a beginning was made
with the building of this railway, which was to consist of a single
line, with a gauge of 3 feet 6 inches, and was to be made with 50-lb.
rails and 7-ft. sleepers; but when, in 1877, after an expenditure of
about £400,000, the railway had been carried no farther than Sarras,
thirty-three and a half miles from the starting-point, it was stopped
for lack of funds.
In the autumn of 1884 the British expedition to Khartoum, where General
Gordon was endeavouring to maintain his position against the Mahdi's
followers, was resolved upon, and it was then decided to extend the
Sudan Railway beyond the point already reached, at Sarras, in order to
facilitate still further the journey of the troops along the valley of
the Nile, which had been selected as the route of the expedition.
Platelaying for the extension was begun in September by a party of
English and Egyptian infantry and native labourers, afterwards joined
by the 4th Battalion Egyptian Army and the 8th (Railway) Company of the
Royal Engineers. While, however, materials previously stored at Sarras
were found to be still available, the trucks containing rails, etc.,
for the extension work had to be pushed by hand from Sarras to railhead
owing to the absence of engines; sleepers were carried on the backs of
camels, of which 300 were employed for the purpose, and the coolie work
was entrusted to 700 native labourers, mainly old men and boys, most
of whom had deserted by the end of October, when further platelaying
was discontinued. By that time the extension works had reached the
thirty-ninth mile, and the line from Sarras to this point was opened on
December 4.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account