Following on the fall of Khartoum and the death of Gordon in January,
1885, came the decision to extend the line to Firket (103 miles), in
view of a then projected further campaign in the autumn of that year.
The extension was sanctioned towards the end of February; fifty-two
miles of permanent way were ordered from England; 300 platelayers
and railway mechanics were obtained from India, to supplement the
construction forces already available; and on August 7 the extension was
completed as far as Akasha (87 miles).
Meanwhile, however, there had been a change of policy which affected
the whole situation. On the return of the expeditionary force to
Korti (situate at the southern extremity of the great Nile bend), the
whole of the country to the south thereof passed under the control of
the Dervishes; and the British Government, reluctant at that time to
enter on the formidable task of reconquest, decided that no further
military operations should be taken in hand, and that the Sudan must be
definitely abandoned. Orders were accordingly given by Lord Wolseley in
May, 1885, for the withdrawal of the troops from all stations south of
Dongola, which itself was abandoned on June 15, the retreat continuing
as far as Akasha. Beyond this point, therefore, platelaying for the
proposed railway extension was not carried, although the formation
levels had been completed to Firket.
Subsequently the British retreat was continued to Wady Halfa, which then
became the southern frontier of Egypt, the railway extension thence to
Akasha, together with all posts to the south of Wady Halfa, being also
abandoned.
Excellent service had, nevertheless, been rendered by the railway, as
far as it was carried.
Operation of the line had been taken over by the 8th (Railway) Company,
R.E., who, at the outset, had at their disposal only five more or less
decrepit locomotives, fifty open trucks, five covered goods vans, and
six brake vans. The troops were conveyed in the open trucks, and by the
end of 1884 all the stores for the opening of the campaign had been
passed up. During the course of 1885 additional locomotives and rolling
stock were obtained from the Cape.
Summing up the work done on the Sudan Military Railway for the Nile
Expedition of 1884-5, Lieut. M. Nathan, R.E.,[39] says that it included
(1) the repair and maintenance of thirty-three and a half miles of
existing railway; (2) the construction of fifty-three and a half
miles of new line through a nearly waterless desert, with no means of
distributing material except the line itself; (3) the transport, for
the most part with limited and indifferent stock, of about 9,000 troops
round the worst part of the second cataract when going up the river, and
round nearly the whole of it when coming down; and (4) the carriage of
40,000 tons for an average distance of thirty-six and a half miles.
As against what had thus been achieved in the Nile Valley must be set a
failure on the Red Sea.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account