The Rise of Rail-Power in War and Conquest, 1833-1914Pratt, Edwin A.
History
The Rise of Rail-Power in War and Conquest, 1833-1914
Pratt, Edwin A.
Railroads; Transportation, Military
When, on the fall of Khartoum in January, 1885, the British Government
first decided on an extension of the Nile Valley Railway, they further
resolved on the building of a military railway from Suakin to Berber,
on the Nile, in order to have a second line of communication available
for Lord Wolseley's Army; and an Anglo-Indian force was sent to Suakin,
under the command of General Sir Gerald Graham, in order, first, to
defeat the Dervishes in the Eastern Sudan, and then to protect the
construction of the proposed railway. Such a line would obviously have
been of great strategical value to a Nile expeditionary force; but
the attempt to build it broke down owing, in part, to the defective
nature of the organisation resorted to, though still more to the active
opposition of the enemy.
Sir Andrew Clarke, Inspector-General of Fortifications, had from the
first advocated that the line should be supplied and laid by the
military engineering strength then available; but he was over-ruled, and
the work was given to an English firm of contractors in the expectation,
as Major-General Whitworth Porter tells, in volume two of the "History
of the Corps of Royal Engineers," "that the necessary material would be
supplied more readily, and in shorter time, through civilian agency."
It was, however, decided to send the 10th (Railway) Company of Royal
Engineers both to carry out some local works in the neighbourhood of
Suakin and to assist the contractors in the longer undertaking; and
this military element was strengthened, not only by a force of Indian
coolies, but, also, by the addition of thirty-nine members of Engineer
Volunteer Corps in England who had enlisted for the campaign, all having
had experience in trades qualifying them for railway work.[40] There was
thus practically a dual system, workable, in the opinion of Sir Andrew
Clarke, "only by a species of compromise which was both unscientific and
uneconomical."
As for interruptions by the Dervishes, these took the form of constant
attacks both on the line under construction and on the workers. Several
actions were fought, and at Tofrik, near Suakin, the British sustained a
serious loss of life. Posts were erected as the work slowly progressed,
and the bullet-proof train mentioned on page 76 was used for patrolling
the line at night; but in face of all the difficulties experienced the
work was definitely abandoned when only twenty miles of the intended
railway had been completed. The troops were recalled in June, 1885,
the railway material not used was brought back to England, and a line
linking up Suakin (and Port Sudan) with Berber, via Atbara Junction, was
not finally opened until 1906.
Reverting to the Nile Valley Railway, it is gratifying to be able to
say that the success already spoken of as having been attained in this
direction was but a prelude to still more important developments that
were to follow.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account