The Rise of Rail-Power in War and Conquest, 1833-1914Pratt, Edwin A.
History
The Rise of Rail-Power in War and Conquest, 1833-1914
Pratt, Edwin A.
Railroads; Transportation, Military
The North-to-South line allowed of an easy movement of troops between
the military headquarters at Keetmanshoop and Windhoek, or vice versâ.
According to the original estimates this line was not to be completed
before 1913. Special reasons for urgency--as to the nature of which it
would be easy to speculate--led, however, to the line being opened for
traffic on March 8, 1912. From Windhoek, also, troops were supplied to
Gobabis, situate 100 miles east of the capital and about forty miles
west of the Bechuanaland frontier. Gobabis became a German military
station in 1895. Provided with a well-equipped fort, it became the chief
strategical position on the eastern border of German South-West Africa.
A railway connecting Gobabis with Windhoek was to have been commenced in
1915.
From Windhoek, as already told, there is rail communication with
Swakopmund.
Grootfontein, the terminus, on the east, of the Swakopmund-Otavi line,
had been a military station since 1899. Its special significance lay
in the fact that it was the nearest point of approach by rail to the
"Caprivi Strip," along which the German troops, conveyed as far as
Grootfontein by rail, were to make their invasion of the adjoining
British territory of Rhodesia. Troop movements in this direction would
have been further facilitated by a link at Karibib connecting the
Swakopmund-Otavi-Grootfontein line with the one to Windhoek and thence
to the military headquarters at Keetmanshoop. Karibib was itself a
military base, in addition to having large railway offices and workshops.
With, therefore, the minor exceptions, the system of railways in German
South-West Africa had been designed or developed in accordance with
plans which had for their basis an eventual attack on British territory
in three separate directions--(1) Cape Province, (2) Bechuanaland and
(3) Rhodesia. The Southern and the North-to-South lines had, also, been
built exclusively with the standard Cape gauge of 3 ft. 6 in., so that,
when "der Tag" arrived, and German succeeded British supremacy in South
Africa, these particular lines could be continued in order to link up
with those which the Germans would then expect to take over from Cape
Province. Keetmanshoop was eventually to be converted from a terminus to
a stopping-place on a through line of German railway from Lüderitzbucht
to Kimberley, the effect of which, it was pointed out, would be to
shorten the distance from Europe to Bulawayo by 1,300 miles as compared
with the journey via the Cape. Surveys had been made for extensions (1)
from Keetmanshoop, via Hasuur, to the Union frontier near Rietfontein,
and (2) from Kalkfontein, on the southern branch, to Ukamas, also on the
frontier and in the direction of Upington, in Union territory. Each of
these additions would have carried the original scheme a stage further,
though it was not, apparently, thought wise to make them before "der
Tag" actually arrived.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account