But no one knew better than the big railroader that there remained much
to be done. He had seen to it that the work was well done and the track
secure and safe for travel. The result of the swift completion was early
operation of the road, and justified Van Horne’s view by bringing in
revenue at once to meet obligations, and by putting the new railway
definitely on the map of the world as a worth while business enterprise.
But the speed in construction made much temporary work necessary. Wooden
trestles were not permanent structures, and neither were wooden
snowsheds. Grades would require to be reduced in places to meet the
demands of growing traffic, and curvatures would have to be modified.
Hence engineers and contractors of the highest class have been
throughout the years engaged here and there in bringing the whole line
to greater perfection, with the result that the Canadian Pacific is
wonderfully free from danger or delay. The ordinary passenger through
the mountains is conscious that he is travelling amidst splendid scenery
on a solid road-bed, but only the practical builder and roadmaster can
estimate with what constant skill and care the road has been built up
and kept to such a high standard of excellence. But even the ordinary
passenger can appreciate things so plainly evident as tunnels, and on
the Canadian Pacific through the mountains he will find the most
interesting system of spiral tunnels in existence, and he will also
enjoy the novelty of speeding in comfort through the longest tunnel on
the continent. A word on these famous tunnels may fittingly find a place
in this chapter on special features.
Previous to 1908 the grades between Hector and Field, in the mountains,
were difficult. For some three miles a grade prevailed which was ten
times the maximum grade permitted on heavy prairie work. This involved
much difficulty in operating, as it necessitated the use of extra
locomotives to pull the train up the grade and prevent it going too fast
on the way down. In fact these grades involved the use of spring
switches along that portion of the line for safety. Unless the
engine-driver of a descending train signalled to the switchman that his
train was under control, the setting of a safety-switch would divert the
train to a catch siding and so bring it to a stop. This system was
operated for twenty-four years without a single accident to a passenger
train. To say that is to magnify the trustworthiness of the men who
operated on the “Big Hill,” and who evidently lived up to the admonition
of the time cards on this division, which read “Obey the rules; be
watchful; run no risks.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account