The romance of the Canadian Pacific RailwayMacBeth, R. G. (Roderick George)
History
The romance of the Canadian Pacific Railway
MacBeth, R. G. (Roderick George)
Canadian Pacific Railway Company
But the increase of traffic as the years passed necessitated the
construction of the famous spiral tunnels through or under Cathedral
Mountain and Mount Ogden and the building of special bridges over the
river. Leaving technical points and figures aside, it may be sufficient
to say that trains entering these mountains climb or descend in a spiral
way with less than half the former engine power and with the utmost
degree of safety. In my observation it has been a constant delight to
passengers to watch how the train loops inside these mountains and comes
out at a different level from that which it entered. It is all so novel
and free from danger that travellers, enjoying the sensation, are loud
in their praise of the engineers and workmen who thought out and
constructed these remarkable spirals through the eternal hills, even
though it cost the Company over a million to make this change for the
pleasure and safety of their guests over the road.
Still more notable as an engineering feat is the great Connaught Tunnel,
five miles long, between Glacier and Stony Creek. It is called after a
well-beloved Governor-General of Canada, the Duke of Connaught, son of
Queen Victoria, of immortal memory. This tunnel was built to avoid the
climb over the top of the famous old Rogers Pass, through a gorge
subject in winter and spring to snow-slides, against which the railway
was protected by four miles and a half of heavily built snowsheds. These
snowsheds were built of wood, and wood is not an everlasting material.
Occasionally sections of this long shed would be carried away and all of
it would show wear in the process of time. Taking this along with the
heavy grade, the Company concluded to tunnel through MacDonald Mountain
and solve all the problems at the same time. The construction of this
double-track tunnel, the longest on this continent, as noted above, was
begun in August, 1913. It took over two years “to make a hole through
the mountain,” but another year saw the tunnel open for regular traffic.
In addition to eliminating the snowsheds, which are not an infallible
protection, the tunnel shortens the distance across the Selkirk range by
over four miles, lowers the summit attained by the railway by 552 feet,
and reduces track curvatures by an amount corresponding to seven
complete circles. Perfect ventilation is attained by powerful fans and I
have passed through the Connaught Tunnel again and again with windows
open and experienced no inconvenience whatever.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account