The work was done by contract by a noted builder of big
things—railways, canals, wharves, etc.—Mr. J. W. Stewart. Perhaps he
is better known to thousands as General “Jack” Stewart, who left his
business in Canada and served during the Great War as the builder in
France and Flanders of the light railways up to the battle front, which
had much to do with the victory of the allies. Stewart had a strenuous
time building the Connaught tunnel, Mr. George Bury, then Western
Vice-President of the Company, giving active co-operation and being
often on the ground.
To recapitulate in some measure the significant things about this
tunnel, in which the world’s records for such work were several times
exceeded, one can say generally that the building of it is another
evidence that the Canadian Pacific Railway will not consider cost in its
efforts to eliminate grades, snow troubles or anything else which stands
in the way of the efficiency and safe operation of the road. Though the
tunnel was opened for traffic about seven years ago, the Company has
kept on making such improvements as preclude all danger from loosened
rock or such like. With that in view a large number of expert workmen
have been kept in the tunnel in regular shifts, and these men are now
completing the fine work of lining the whole tunnel, roof, sides and
all, with concrete, in such a way that nothing more can be thought of to
make the great “bore” through the MacDonald Mountain safe, secure and
scientifically sound. The original contract cost has thus been steadily
increased for some years, though the tunnel was safe for traffic when it
was opened, until it is probably within the limit to say that this great
engineering feat has cost the Company close to ten millions. Just what
some of the early critics of the cost of the Canadian Pacific, who
thought a bonus from the Government of twenty-five millions in addition
to a grant of land was excessive, would think of a case like this, must
be left to some one with vivid imagination to say. In this single
instance we find the Company, after expending an immense sum on crossing
through the Rogers Pass in early construction days, building then nearly
five miles of expensive snowsheds and having everything in running
order, abandoning the whole thing, and at a cost of nearly ten millions
more, going on to make their line more useful and more safe. No doubt
the early engineers in the 80’s saw that some such tunnel might be
possible, but the railway was then battling for life and could not spend
nearly half its total cash bonus on a space of five miles in a road that
would measure three thousand miles or so across Canada.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account