He took an elevator from his suite down to the main floor of the
organizational complex and stepped out into the hallway. He walked with
a firm tread, and men stepped aside with a slight deferential bow. He
passed through the great glass doors at the end of the passage into a
huge foyer. Passing through, he entered a courtyard, strode across it,
and came into the working area.
About sixty men were working at various stations. The men felt that
Zimbardo was a real leader and were glad to see their new commander. It
was amazing how rapidly the sense of defeat had been changed to one of
expectancy and pride.
Every day or two another ship docked and new workers came in to join the
crew. Zimbardo had sent out a few trusted leaders to recruit men form
noted asteroid bases and mining operations in the proximity of his
asteroid. He could use more men, especially skilled workers in
electronics and mathematics, but he wasn’t eager to build up a large
force. He chose carefully. The workforce was being built up gradually
with men he could trust. He had also invited three smugglers he had
known before to join the operation, with their men.
“Stubb,” called out Zimbardo.
“Sir,” responded the man so addressed, an eager man about thirty years
old, with sandy blond hair and baby blue eyes. He hastened up to the
pirate leader.
“Give me a status report. The ships first.”
“The sheathing systems are easy to manufacture, thanks to the ample
supplies from the warehouses. The men are able to put them together
rapidly, even the unskilled workers, since they just need a master
circuit to copy. I have forty men working on these, with the skilled
electricians checking each plate. As you know, we completed work on ten
ships six days ago; they were tested and went out on their assignments.
They have not returned yet. These plates we’re working on now are going
on the remaining ships, and we have already finished work on four of
them. That leaves just three to go, including the ship that just joined
the crew yesterday. We should be finished by tomorrow afternoon.”
“Good. And the power units?”
“These are far more complicated, sir, so I only have the most skilled
workers assembling these. The same with the propulsion units. They won’t
be ready for at least a week, not even one of them. However, once we get
the prototype finished the rest should follow rapidly.”
“How long until you have all 85 completed?”
“I should have a good number of the unskilled workers ready for a new
assignment once they have finished with the sheathing plates. Once the
design has been checked by the experts, we can get them cracking on the
power and propulsion units. Of course, each unit will have to be tested
by the experts, so I would estimate that all 85 can be operational
within ten days--unless we run into any problems.”
“Good work, Mr. Stubb. I will check on progress every day.”
“Very well, sir.” The man went back to work and Zimbardo returned to the
main complex.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account