The Salton Sea: An account of Harriman's fight with the Colorado RiverKennan, George
History
The Salton Sea: An account of Harriman's fight with the Colorado River
Kennan, George
Harriman, Edward Henry, 1848-1909; Imperial Valley (Calif. and Mexico); Salton Sea (Calif.)
“... In cutting from the main canal to the river at this point, we
had to dredge a distance of 3300 feet only, through easy material to
remove, while an attempt to dredge out the main canal above would
have meant the dredging of four miles of very difficult material. We
began the cut the latter end of September and completed it in about
three weeks. As soon as the cut was decided upon, elaborate plans
for a controlling gate were immediately started, and when completed,
early in November, were immediately forwarded to the City of Mexico
for the approval of the engineers of the Mexican Government, without
whose approval we had no authority or right to construct the gate.
Notwithstanding the insistence of our attorney in the City of Mexico,
and various telegraphic communications insisting upon this approval
being hurried, we were unable to obtain it until twelve months
afterward, namely, the month of December 1905.
“In the meantime, serious trouble had begun. We have since been
accused of gross negligence and criminal carelessness in making this
cut; but I doubt as to whether anyone should be accused of negligence,
or carelessness, in failing to foresee what had never happened before.
We had before us at the time the history of the river as shown by
the rod-readings kept at Yuma for a period of twenty seven years. In
the twenty seven years there had been but three winter floods. In no
winter of the twenty seven had there been two winter floods. It was
not probable, then, that there would be any winter flood to enlarge
the cut made by us, and without doubt, as it seemed to us, we would be
able to close the cut, before the approach of the summer flood, by the
same means that we had used in closing the cut for three successive
years around the Chaffey gate at the head of the canal.[9] During
this winter of 1905, however, we had more than one winter flood. The
first flood came, I believe, about the first of February, but did
not enlarge the lower intake. On the contrary, it caused such a silt
deposit in the lower intake that I found it necessary, after the flood
had passed, to put the dredge through in order to deepen the channel
sufficiently to allow water to come into the valley for the use of the
people. This was followed shortly by another heavy flood that did not
erode the banks of the intake, but, on the contrary, the same as the
first, caused a deposit of silt and a necessary dredging. We were not
alarmed by these floods, as it was still very early in the season. No
damage had been done by them, and we still believed that there would
be no difficulty in closing the intake before the approach of the
summer flood, which was the only one we feared. However, the first two
floods were followed by a third, coming sometime in March, and this
was sufficient notice to us that we were up against a very unusual
season, something unknown in the history of the river as far back as
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account