The Salton Sea: An account of Harriman's fight with the Colorado RiverKennan, George
History
The Salton Sea: An account of Harriman's fight with the Colorado River
Kennan, George
Harriman, Edward Henry, 1848-1909; Imperial Valley (Calif. and Mexico); Salton Sea (Calif.)
The difficulty of dealing with this menacing situation was greatly
increased by the necessity of furnishing an uninterrupted supply of
water to the farmers of the valley while engineering operations were
in progress. It would not do to shut the river out altogether, because
that would leave without irrigation nearly two hundred square miles
of cultivated land. The Colorado must be controlled, but not wholly
excluded. Several methods of solving this problem were suggested, but
the only two that seemed likely to succeed were advocated by Consulting
Engineer Schuyler and Chief Engineer Rockwood. Mr. Schuyler proposed
that a new steel-and-concrete head-gate be put in near Pilot Knob,
where a solid rock foundation could be secured; that the four miles of
silted channel be re-excavated and enlarged by a powerful steam dredge
specially built for the purpose; and that the whole low-water flow
of the river be then turned through this head-gate into the enlarged
canal and thence into the Alamo barranca west of the break. By this
means the settlers would be continuously supplied with water, while the
crevasse-opening would be left dry enough to close with a permanent
levee or dam. The whole work, it was thought, could be finished in
three months, or at least before the coming of the next summer flood.
Chief Engineer Rockwood’s plan also involved the building of a new
head-gate, but he proposed to locate it on the northern side of the
intake, and to carry the whole low-water flow of the river through it
by means of an excavated by-pass. This, too, would keep the settlers
supplied with water and leave the crevasse-opening dry while it was
being closed. The chief objection to the latter plan was that the
head-gate would necessarily be of wood, and would have to stand on
a treacherous foundation of easily eroded silt which might possibly
be undermined. Late in November, after full consideration, President
Randolph decided to try both plans and to work on them simultaneously.
Contracts for the structural steel and iron work for the concrete
head-gate were let in Los Angeles; the machinery for the 850-ton
floating dredge “Delta” was ordered in San Francisco; materials for
the Rockwood head-gate were collected on the northern side of the
intake, and work was pushed on all of these structures with the
greatest possible energy throughout the winter. In spite, however, of
all efforts, none of them could be finished in the allotted time. The
steel-and-concrete head-gate was not completed until the 28th of June;
the dredge “Delta,” owing to the partial destruction of San Francisco,
was not ready until the following November, and even the Rockwood gate,
on which alternate shifts of men had worked night and day, was not in
working order until the 18th of April. Meanwhile, the summer flood
of 1906 had begun, with a discharge of 32,200 cubic feet per second
through the crevasse. This flow would have exceeded the capacity of the
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account